Viavi OneAdvisor-1000 Скачать руководство пользователя страница 2

VIAVI//Public

OneAdvisor-1000 Portable Network Tester

OneAdvisor-1000 Portable Network Tester

Q U I C K   C A R D

2

C O N N E C T  TO   F I B E R   U N D E R   T E S T  ( F U T )

All fibers and connectors should be inspected and 
clean prior to connection, as described on page 1.  
The OTDR may be connected to the FUT via an 
optical patch panel (OPP) or a coupler:

1.

Inspect the OTDR port on top of the test set. 

2.

Inspect the fiber end face of the Launch Cable.

3.

Connect the Launch Cable to the OTDR port.

4.

If the interface to the FUT is a patch cord, 
connect the patch cord to an optical coupler.

5.

Inspect the FUT connected to the coupler or 
OPP port and the fiber end face of the Launch 
Cable.

6.

Connect the Launch Cable to the coupler or 
OPP port.

Figure 5: Connecting to OPP

L A U N C H   T E S T

1.

Press the Power button       on the top of the 
OneAdvisor to start the test instrument.

2.

Tap the 

Tests icon 

3.

Select the OTDR Module

4.

Tap the 

OTDR EXPERT 

icon

Figure 6: Fiber Optics Home Screen

Figure 4: Connecting to coupler

Figure 3: OTDR Port Inspection

Содержание OneAdvisor-1000

Страница 1: ...run inspection test Repeat until it passes Figure 2 Inspect Before You Connect Figure 1 Equipment Requirements 4100 series Expert OTDR This quick card explains how to connect to a fiber under test configure EXPERT OTDR test settings using Quick Setup run tests and analyze results on a VIAVI ONA 1000 equipped with a 4100 series OTDR module ONA 1000 equipped with the following Fiber Optics Software ...

Страница 2: ...of the Launch Cable 3 Connect the Launch Cable to the OTDR port 4 If the interface to the FUT is a patch cord connect the patch cord to an optical coupler 5 Inspect the FUT connected to the coupler or OPP port and the fiber end face of the Launch Cable 6 Connect the Launch Cable to the coupler or OPP port Figure 5 Connecting to OPP LAUNCH TEST 1 Press the Power button on the top of the OneAdvisor ...

Страница 3: ...lect Auto to automatically configure Range Pulse width and Resolution settings Select SmartAcq to perform an acquisition with a short pulse width followed by an acquisition with a longer pulse width The first acquisition allows events at the beginning of the fiber to be detected more precisely Acq Time Select Realtime Auto or the desired time to sample the fiber Launch Cable Select and enter Lengt...

Страница 4: ...b at the left screen top to select SmartLink view 2 Set the toggle switch at the right screen top to Event Line 3 View SmartLink results The FUT is displayed as a series of icons representing events front connector launch cable connectors splices bends etc and distances Swipe left or right to view additional icons on spans with more than 4 events The center of the display shows summary results for...

Страница 5: ...he upper display Graphical results dB versus distance are shown in the center display A color coded Event table is shown in the lower display Swipe up and down to view all events Figure 13 Trace view Figure 14 Table view 1 Tap the Table tab at the left screen top to select Table view 2 Set the toggle switch at the right screen top to the center off position 3 View table results Distance Loss and R...

Страница 6: ...utions com contact 1 844 GO VIAVI 1 844 468 4284 FAST REPORT 1 Tap the File soft key and tap the Project folder 2 Tap the Create Directory soft key and enter a name for your new folder All trace files will be saved to this directory 3 Tap the Exit soft key 4 Tap the Fast Report soft key and enter Cable ID Fiber Number Locations Direction and Save Mode 5 Tap Save 6 Tap to accept the default filenam...

Отзывы: