26
020574.06
vetus®
Installation instructions thruster RIM DRIVE 250 mm
t
ip
Use the holes 12 mm (
15
/
32
”) dia. to install temporarily lifting eyes.
c
aution
Apply a ‘spreader’ in order to avoid damage to the terminal box.
Use two angle brackets to lift the RimDrive if it is installed horizon-
tally.
Slide the rubber sleeves together with the plastic slabs and the
clamping straps halve way back over the Rimdrive.
Tighten the bolts of the clamping straps with a torque of 12 Nm (9
ft.lbf).
Remove the temporarily support or the hoist and check if the Rim-
drive remains seated.
Apply a sealant on the inside transition to influence the flow of water
as little as possible.
MIN.
75 cm
(30”)
Apply a proper support under the RimDrive in case of:
- A tunnel tube length of more than 250 mm from RimDrive to hull.
- High speed or planing vessels.
≥ 250 mm (10”)
n
ote
Check for possible leaks immediately the ship returns to water .