126
-
To install the new ball bearing, proceed as
shown in the figure using the modular punch.
Note:
Install the bearing
Specific equipment and tools:
Handle
020376Y
1.1
×
1.2 in. (28
×
30mm) adapter
020375Y
10.7.17
Refitting the Driven Pulley
Note:
Before proceeding with the assembly ensure
the working surface is in good conditions, and
shows no signs of abnormal or wear, as described
in the previous section.
-
Insert the new oil seals and O-rings on the
moving half-pulley.
-
Carefully grease the O-ring (marked as «A» in
the figure).
-
Install the half-pulley on the bushing using the
specific tool.
Specific equipment and tools:
Protective sheath
020263Y
-
Ensure that the pins and the collar are not worn
and then refit them, using the apposite slits.
Содержание GT 200
Страница 1: ......
Страница 90: ...90 9 1 2 Turn Signal Lights Horn Services and Accessory Pre Wiring ...
Страница 151: ...151 10 10 Lubrication Circuit ...
Страница 195: ...195 Remove the main jet Loosen the emulsion jet Tilt the carburetor and remove the emulsion jet ...