Important Safety Instructions
Safety Admonishments Definitions
Definitions of the safety admonishments used in this document are listed under “Admonishments Used in this Document” on page v.
You Must Follow Approved Safety Procedures
DANGER!
Performing the following procedures may expose you to hazards. These procedures should be performed by
qualified technicians familiar with the hazards associated with this type of equipment. These hazards may include shock,
energy, and/or burns. To avoid these hazards:
a)
The tasks should be performed in the order indicated.
b)
Remove watches, rings, and other metal objects.
c)
Prior to contacting any uninsulated surface or termination, use a voltmeter to verify that no voltage or the expected
voltage is present. Check for voltage with both AC and DC voltmeters prior to making contact.
d)
Wear eye protection.
e)
Use certified and well maintained insulated tools. Use double insulated tools appropriately rated for the work to be
performed.
Buried Utilities
CAUTION!
When installing the enclosure, ensure the site is free of any buried utilities. Call 811 before installation. Severe
damage, serious injury, or death can occur if buried utilities are not identified prior to installation.
Personal Protective Equipment (PPE)
DANGER!
ARC FLASH AND SHOCK HAZARD.
Appropriate PPE and tools required when working on this equipment. An appropriate flash protection boundary analysis
should be done to determine the “hazard/risk” category, and to select proper PPE.
Only authorized and properly trained personnel should be allowed to install, inspect, operate, or maintain the equipment.
Do not work on LIVE parts. If required to work or operate live parts, obtain appropriate Energized Work Permits as required