8 INITIAL START-UP CHECKS AND COMMISSIONING
PROCEDURE FOR WARRANTY INSPECTION
WARNING! Arc flash and electric shock hazard. Open all local and remote electric power-supply
disconnect switches, verify with a voltmeter that power is Off and wear appropriate,
OSHA-approved personal protective equipment (PPE) per NFPA 70E before working within the
electric control enclosure. Failure to comply can cause serious injury or death. Customer must
provide earth ground to unit, per NEC, CEC and local codes, as applicable. Before proceeding
with installation, read all instructions, verify that all the parts are included and check the
nameplate to be sure the voltage matches available utility power. The Liebert® controller does
not isolate power from the unit, even in the “Unit Off” mode. Some internal components require
and receive power even during the “Unit Off” mode of the controller. The only way to ensure
that there is NO voltage inside the unit is to install and open a remote disconnect switch. Refer
to unit electrical schematic. Follow all local codes.
WARNING! Risk of improper wiring, piping, moving, lifting and handling. Can cause equipment
damage, serious injury or death. Installation and service of this equipment should be done only
by qualified personnel who have been specially-trained in the installation of air-conditioning
equipment and who are wearing appropriate, OSHA-approved PPE.
CAUTION: Risk of smoke generation. Can cause fire suppression and alarm system activation,
resulting in injury during building evacuation and mobilization of emergency fire and rescue
services. Start-up operation of optional electric reheat elements can create smoke or fumes
that can activate the facility alarm and fire suppression system. Prepare and take appropriate
steps to manage this possibility. Activating reheat during initial start-up may burn off
particulates from electric reheat elements. Check the steam generating humidifier electrode
plugs to ensure that they are pressed firmly onto the pins. Loose connections will cause the
cylinder and plugs to overheat. Before beginning initial start-up checks, make certain that unit
was installed according to the instructions in this manual. All exterior panels must be in place.
•
Confirm that all items on
Checklist for Completed Installation
on page 31 have been done.
•
Locate “Liebert® Mini-Mate Warranty Inspection Check Sheet” in the unit’s electric panel.
(PSWI-8542-437RE)
•
Complete “Liebert® Mini-Mate Warranty Inspection Check Sheet” during start-up.
(PSWI-8542-437RE)
•
Forward the completed “Liebert® Mini-Mate Warranty Inspection Check Sheet” to your local
sales office. This information must be completed and forwarded to validate warranty.
•
Contact your local sales representative or technical support if you have any questions or
problems during unit start-up and commissioning. Visit https://www.vertivco.com/en-
us/support/ or call 1-800-543-2778 for contacts.
Local sales offices and product support contacts can be found at https://www.vertivco.com/en-
us/support/ or 1-800-543-2778.
8 Initial Start-up Checks and Commissioning Procedure for Warranty Inspection
33
Содержание Liebert Mini-Mate MT036
Страница 8: ...Vertiv Liebert Mini Mate Installer User Guide 8 This page intentionally left blank ...
Страница 14: ...Vertiv Liebert Mini Mate Installer User Guide 14 This page intentionally left blank ...
Страница 26: ...Vertiv Liebert Mini Mate Installer User Guide 26 This page intentionally left blank ...
Страница 30: ...Vertiv Liebert Mini Mate Installer User Guide 30 This page intentionally left blank ...
Страница 32: ...Vertiv Liebert Mini Mate Installer User Guide 32 This page intentionally left blank ...
Страница 34: ...Vertiv Liebert Mini Mate Installer User Guide 34 This page intentionally left blank ...
Страница 46: ...Vertiv Liebert Mini Mate Installer User Guide 46 This page intentionally left blank ...
Страница 50: ...Vertiv Liebert Mini Mate Installer User Guide 50 This page intentionally left blank ...
Страница 52: ...Vertiv Liebert Mini Mate Installer User Guide 52 This page intentionally left blank ...
Страница 54: ...Vertiv Liebert Mini Mate Installer User Guide 54 This page intentionally left blank ...
Страница 79: ...Vertiv Liebert Mini Mate Installer User Guide ...