
REV : 0
REV DATE : 1/19
DPN004899
Page :1 /1
F
or
m
N
o.
: D
P
N
00
10
40
_R
E
V
4
LIEBERT CW
CW305, 375, 415 W/ BOTTOM DISCHARGE
COMPONENT LOCATION DIAGRAM
1. Blower/Motor (Typical 3)
2. Line Reactor Transformers (Typical 3)
3. Evaporator Coil
4. Air Filters
5. Condensate Pump (optional, shipped loose)
6. Electric Panel
7. THD Mitigation Device (optional)
8. VFD Assemblies (Typical 3)
9. 575V Transformer (if applicable)
Notes:
1. Electrical Compartment (item #6) shown on left side of unit. Unit may be ordered with Electrical Compartment on either side, or with Electrical Compartment facing into Gallery space.
2. Condensate Pump (if ordered) to be shipped loose and attached to this frame member for shipping. Customer to locate and install.
6
3
Panels removed
for clarity
4
8
1
2
9
5
2
7
Содержание Liebert CW
Страница 1: ...Liebert CW Thermal Management System Installer User Guide 305 kW 375 kW 415 kW Capacity 50 60 Hz...
Страница 10: ...Vertiv Liebert CW Installer User Guide 6 This page intentionally left blank...
Страница 24: ...Vertiv Liebert CW Installer User Guide 20 This page intentionally left blank...
Страница 32: ...Vertiv Liebert CW Installer User Guide 28 This page intentionally left blank...
Страница 34: ...Vertiv Liebert CW Installer User Guide 30 This page intentionally left blank...
Страница 36: ...Vertiv Liebert CW Installer User Guide 32 This page intentionally left blank...
Страница 46: ...Vertiv Liebert CW Installer User Guide 42 This page intentionally left blank...
Страница 48: ...Vertiv Liebert CW Installer User Guide 44 This page intentionally left blank...
Страница 75: ...Vertiv Liebert CW Installer User Guide...