4.2.9 Signal Cable Connection Steps
N O T E: R espectively ro u te th e po wer cables an d sign al cables. T h e sh ieldin g co at o f sign al cable m u st
be reliably earth ed.
Two connection modes are available: top cable access, bottom cable access. Refer to Figure 4.9 below and Figure 4.10 on
the facing page for the cabling route and then connect signal cables to corresponding ports shown in Figure 4.4 on page 42.
F igu re 4.9 Sign al cables wirin g ro u te o f 250 k VA (to p cable access)
N O T E:
Step 1: Lead cables in to th e cabin et th ro u gh th e h o les.
Step 2: T h en co n n ect th em to co rrespo n din g term in als
4 Electrical Installation
50
Vertiv™ Liebert® APM Plus User Manual
Содержание APM 0250kMK16FN02000
Страница 1: ...Vertiv Liebert APM Plus User Manual 50 250 kVA UPS...
Страница 8: ...vi This page intentionally left blank Vertiv Liebert APM Plus User Manual...
Страница 16: ...1 Important Safety Instructions 8 This page intentionally left blank Vertiv Liebert APM Plus User Manual...
Страница 30: ...2 Overview 22 This page intentionally left blank Vertiv Liebert APM Plus User Manual...
Страница 60: ...4 Electrical Installation 52 This page intentionally left blank Vertiv Liebert APM Plus User Manual...
Страница 73: ...Figure 5 11 Customize the display 5 Operator Control and Display Panel 65 Vertiv Liebert APM Plus User Manual...
Страница 97: ...5 Operator Control and Display Panel 89 Vertiv Liebert APM Plus User Manual...
Страница 154: ...Figure 8 8 LBS port J4 on bypass control module 8 Parallel System and LBS System 146 Vertiv Liebert APM Plus User Manual...
Страница 182: ...11 Service and Maintenance 174 This page intentionally left blank Vertiv Liebert APM Plus User Manual...
Страница 188: ...12 Specifications 180 This page intentionally left blank Vertiv Liebert APM Plus User Manual...
Страница 191: ...Vertiv Liebert APM Plus User Manual...