
Vertiv
|
+24 VDC Power System User Manual (Section 6013)
|
Rev. G
124
Figure 6:
Installing Converter Output Cables (if required)
LIST LB
(LISTS JA, JB, JC
and LC SIMILAR)
Connect /–48/ jumpers
to an available landing here.
Assembly order is: lug, 1/4" flat
washer, 1/4" lock washer, 1/4-20
hex nut. Torque to 84 in. lbs.
LIST KA
Module Mounting Shelf
Connect /–48/ jumpers here.
Assembly order is: lug, 1/4" flat washer,
1/4" lock washer, 1/4-20 nut.
Torque to 84 in. lbs.
Dual Voltage Distribution Bus