background image

 

Vertex™ 

Rx-Z Series Zeolite Reactor Instruction Manual

   

           

        

©Vertex Aquaristik ™ 2018

  

 

 

 

P

ag

e

 

-

 

Vertex™ 

Rx-Z Series Zeolite Reactor 

 

  

 

Thank you for your purchase of the Vertex™ 

Rx-Z Series Zeolite Reactor. Please be sure to read and 

follow this brief guide to ensure proper install and operation of your reactor. 
  
 

In the box:  
 

1-

 

Rx-Z Main Unit 

2-

 

Eheim™ Pump and Manual

 

3-

 

U-Line Assembly 

4-

 

T-Handle and Titanium Screw 

5-

 

Output Assembly 

6-

 

Pump Rubber Footing 

7-

 

Owner’s Manual

 

 
 

Install and Operate:  

 

1-

 

Remove your reactor and its components from the box and inspect for any possible defects. If 
there are any concerns, please contact your dealer within 48 hours of receiving your reactor; 
refrain from installing the unit and keep all original packaging as well as proof of purchase. 

 

 

Any damages to the unit during transport are not covered under warranty and must be claimed 
with the forwarder at the time of receiving the product.  

 

2-

 

After proper inspection, clean the unit with a damp cloth using RO water to ensure removal of 
any oils and/or chemicals used during the manufacturing process.  

3-

 

Remove the inner chamber from the reactor. 

4-

 

Insert rubber footing supplied into the dedicated slots under the pump. 

5-

 

Attach  the  pump  to  the  U-Line  assembly.  This  connection  is  pressure-fit  for  easier  future 
maintenance; insert the pump output into the check valve. There is no need to glue the pump 
however if desire this can be accomplished using most multi-purpose liquid plastic adhesive such 
as  cyanoacrylate.  Only  apply  the  glue  in  an  up  right  standing  position.  Possible  run  off  will 
damage the check valve. Do not over apply and avoid skin contact.  

6-

 

Attach the U-Line assembly and pump to the body using the dedicated union connections.  

7-

 

Turn the U-Line assembly in the correct direction and place the pump over its dedicated area on 
the reactor base.  

Отзывы: