Vertex™
Rx-Z Series Zeolite Reactor Instruction Manual
©Vertex Aquaristik ™ 2018
P
ag
e
-
1
-
Vertex™
Rx-Z Series Zeolite Reactor
Thank you for your purchase of the Vertex™
Rx-Z Series Zeolite Reactor. Please be sure to read and
follow this brief guide to ensure proper install and operation of your reactor.
In the box:
1-
Rx-Z Main Unit
2-
Eheim™ Pump and Manual
3-
U-Line Assembly
4-
T-Handle and Titanium Screw
5-
Output Assembly
6-
Pump Rubber Footing
7-
Owner’s Manual
Install and Operate:
1-
Remove your reactor and its components from the box and inspect for any possible defects. If
there are any concerns, please contact your dealer within 48 hours of receiving your reactor;
refrain from installing the unit and keep all original packaging as well as proof of purchase.
Any damages to the unit during transport are not covered under warranty and must be claimed
with the forwarder at the time of receiving the product.
2-
After proper inspection, clean the unit with a damp cloth using RO water to ensure removal of
any oils and/or chemicals used during the manufacturing process.
3-
Remove the inner chamber from the reactor.
4-
Insert rubber footing supplied into the dedicated slots under the pump.
5-
Attach the pump to the U-Line assembly. This connection is pressure-fit for easier future
maintenance; insert the pump output into the check valve. There is no need to glue the pump
however if desire this can be accomplished using most multi-purpose liquid plastic adhesive such
as cyanoacrylate. Only apply the glue in an up right standing position. Possible run off will
damage the check valve. Do not over apply and avoid skin contact.
6-
Attach the U-Line assembly and pump to the body using the dedicated union connections.
7-
Turn the U-Line assembly in the correct direction and place the pump over its dedicated area on
the reactor base.