background image

2332 Cathy Lane

Jasper, Indiana

47546

800.876.2120

812.482.9318 Fax

www.versteel.com

Thank you for your purchase.  Versteel®

hopes that you have many great years

of use from this table and from all of our

products.  If you have ques

ti

ons that 

these instruc

ti

ons don’t answer, please

call customer service at 800.876.2120.

 

DOCUMENT CONTAINS 1 PAGE

 

 

  

BRATTICE

BRATTICE

®

 FOLDING TABLE LEGS

 

 

 

 

 

 

COMPONENTS:

TABLE TOP (1 QTY)

LEG/FOLDING PAN ASSEMBLY (2 QTY)

SCREWS (24 QTY)

ASSEMBLY :  STEP 1

PLACE THE TOP FACE DOWN ON THE FLOOR.
(MAKE SURE THE FLOOR IS CLEAN AND FREE
OF ANY DEBRIS.) 

ASSEMBLY :  STEP 2

LOCATE THE BASE PRE-DRILLS ON THE TOP.
TYPICALLY THE HOLES FOR THE FOUR (4)
CORNERS OF EACH FOLDING PAN WILL 
HAVE PRE-DRILLS ON THE TOPS. (DIAGRAM 1)

PLACE LEG ASSEMBLIES OVER THE PRE-DRILLS.
VERIFY THE CORRECT BASE ORIENTATION.
(DIAGRAM 2)

NOTE:  WHEN INSTALLING BASES, IT IS
ABSOLUTELY CRITICAL THAT THE TORQUE
SETTING ON THE POWER DRIVER BE AT
THE LOWEST LEVEL NECESSARY TO SET
THE SCREWS IN ALL THE WAY.  OVER-
TORQUEING SCREWS WILL RESULT IN
“STRIPPED-OUT” SCREWS, AND BASES
MAY PULL AWAY FROM TOP WHILE IN USE.
THIS IS ESPECIALLY COMMON WHEN HIGH-
VOLTAGE POWER DRIVERS ARE USED WITH
CLUTCH SETTING ON “DRILL/DRIVER.”

IT IS THE RESPONSIBILITY OF INSTALLER TO
ENSURE THAT PROPER TORQUE SETTINGS
ARE USED TO PREVENT STRIPPED-OUT
SCREWS.

1

A

C

B

TOOLS REQUIRED:

2

CONT’D 

POWER DRILL/DRIVER
WITH ADJUSTABLE TORQUE

 

ASSEMBLY INSTRUCTIONS

  :

BRATTICE FOLDING TABLE LEGS

ASSEMBLY INSTRUCTIONS   :

(4) OUTER HOLES OF TOP PLATE ARE
PRE-DRILLED IN TOP FOR LOCATING

Отзывы: