Three other methods are also approved by the NFPA: 

• 

Using a section of double-wall chimney with a 

9 mm (9”) clearance to combustibles.

• 

Placing a section of chimney connector inside 

a ventilated thimble, which in turn is separated from 
combustibles by 15 mm (6”) of fiberglass insulating 
material. 

• 

Placing a section of chimney connector inside a 

section of 9 mm (9”) diameter, solid-insulated, facto-
ry-built chimney, with 51 mm (”) of air space between 
the chimney section and combustibles.
Figure 10 shows one method of passing a connector 
through a wall. All combustible material in the wall is cut 
away to provide the required 457 mm (18”) clearance 

* Check These 

Clearances

ST244
Plymouth
fplc over mantel
12/99

*

*

Chimney 

Connector Shields

Mantel

Seal Damper 

to Air Flow

ST44

fig. 7 

 In this installation, the chimney connector is attached 

to the chimney above the fireplace opening.

ST245
fireplace 
flex connector
12/99

Flexible Connector

Mantel Shield

Fireplace Adapter 

Kit “Positive Con-

nection”

ST45

fig. 8

  In this installation, the chimney connector enters the 

firepalce opening and then connects to the chimney.

through the fireplace

If your fireplace opening height is at least 675 mm 
(6

¹⁄₂

"), you may install an Encore through the opening 

using a “positive connection” kit, available from your lo-
cal dealer. These positive connection kits ensure a tight 
fit between the stove flue collar and the chimney flue.  
(Fig. 8) 
Fireplace installations, whether connected to the flue 
above or through the fireplace opening, have special 
clearance requirements to adjacent trim and the mantel. 
You’ll find the required safe clearances for Encore fire-
place installations on Page 1 and Figure 14.  
Floor protection requirements also apply to fireplace 
installations. This information is on Page 19.

wall pass-throughs

Whenever possible, design your installation so the con-
nector does not pass through a combustible wall. If you 
are considering a wall pass-through in your installation, 
check with your building inspector before you begin. 
Also, check with the chimney connector manufacturer 
for any specific requirements.
Accessories are available for use as wall pass-
throughs. If using one of these, make sure it has been 
tested and listed for use as a wall pass-through.  
Figure 9 shows one recommended method. All combus-
tible material in the wall is cut away from the single-wall 
connector to provide the required 305 mm (1”) clear-
ance. Any material used to close up the opening must 
be noncombustible.

T

ST494
steel
wall pass thru
11/00

18” (460mm) clear 

space all around 

the pipe

ST494

fig. 9

  An approved wall pass-through for Canada.

Содержание Encore 1450C

Страница 1: ...the risk of fire follow the installation instructions Failure to follow instructions may result in property damage bodily injury or even death Contact local building officials about restrictions and...

Страница 2: ...Vermont Castings stove It also contains useful information on maintenance and assembly of this product We urge you to read the manual thoroughly and to keep it as a reference Sincerely All of us at MH...

Страница 3: ...r 8 oval flue collar 203 mm 8 diameter for optional 6 flue collar 152 mm 6 diameter Chimney flue size for 8 oval flue collar 203 mm 8 minimum for optional 6 flue collar 152 mm 6 minimum Flue exit posi...

Страница 4: ...low all instructions exactly and do not allow makeshift com promises to endanger property and per sonal safety All local regulations including those referring to national and European standards need t...

Страница 5: ...6 and be of the twin wall insulated construction that has been approved for solid fuel use e g Rite Vent ICS of ICID Lite Chimney Systems Diameters over 200 mm 8 are not recommended due to the large...

Страница 6: ...on of chimney connec tor serve as guides when you drill 3 mm 1 8 holes in the bottom of the next section Secure the chimney connector to the chimney In structions for various installations follow Be s...

Страница 7: ...mble sleeve should protrude 25 51 mm 1 2 into the room Fig 6 Use furnace cement and thin gasketing to seal the sleeve in place in the thimble Secure the chimney connector to the outer end of the sleev...

Страница 8: ...675 mm 26 you may install an Encore through the opening using a positive connection kit available from your lo cal dealer These positive connection kits ensure a tight fit between the stove flue colla...

Страница 9: ...clearances of the hearth are as fol lows The constructed hearth should be constructed in ac cordance with the recommendations in document J and should be of minimum width 840 mm and minimum depth 840...

Страница 10: ...o any combustible surfaces e g wooden mantels or lintels and to timber framed studded walls even if they are faced with noncombustible board Detailed information on fireplace and hearth construction i...

Страница 11: ...ces and Fuel Storage Systems This can be achieved by following the recommenda tions of Approved Document J These are as shown in Figure 13 34 FLUEPIPE CLEARANCES D at least 3 x D Elevation Without Shi...

Страница 12: ...no weight on the leg while making the adjustment Reverse the Flue Collar If Necessary Reverse the flue collar by removing the two 2 screws that attach it to the back of the stove Be sure the gas ket...

Страница 13: ...ided with stove under the right wing of the bottom heat shield with two 2 10 sheet metal screws 5 Attach the rheostat to its holder by inserting the rheostat control shaft through the holder hole Inst...

Страница 14: ...Andirons ST636 Fig 19 The Encore controls are conveniently located and easy to operate Door Handle A Single Air Control Regulates Heat Output and Burn Time The primary air control lever located on th...

Страница 15: ...d is their density Hardwoods because of their greater density burn longer than softwoods and can increase the time between refuelings Store wood under cover to keep it dry The longer it is stored in a...

Страница 16: ...far right to 1 3 the distance to left Medium From 1 3 to 2 3 the distance to left High From 2 3 the distance to left to far left DO NOT OPERATE THE STOVE WITH THE ASH DOOR OPEN OPERATION WITH THE ASH...

Страница 17: ...nclude some smaller pieces of wood in the new fuel load to help the stove regain its operating temperature quickly Use this sequence as a guide to successful refueling NOTE Door handles can be hot A g...

Страница 18: ...lly dispersed it should be kept in the closed container until all cinders have thoroughly cooled You can use wood ash as a garden fertilizer CAUTION Never use your household or shop vacuum cleaner to...

Страница 19: ...at heat from the chimney walls will transfer to the house and not be wasted outdoors An indoor chimney will not lose its heat to the outdoors so Draft Management it takes less heat from the stove to h...

Страница 20: ...voiding overly dry wood loaded into a very hot stove may help this problem If back puffing persists contact your dealer or qualified chimney sweep to help diag nose the problem Draft Testing An easy w...

Страница 21: ...not use abrasive cleaners Rinse the glass thoroughly Dry the glass completely Replace Broken Glass Immediately Do not operate your stove if the glass in the doors is damaged If you need to replace th...

Страница 22: ...an end and pulling firmly 2 Use a wire brush or the tip of a screwdriver to clean the channel of any remaining cement or bits of gasket Fig 32 Remove stubborn deposits of cement with a cold chisel if...

Страница 23: ...cantly However regular chimney inspection and maintenance must still be performed For safety good stove performance and to protect your chimney and chimney connector inspect your chimney and chimney c...

Страница 24: ...and remove ash build up behind the com bustion package This should be done in conjunction with annual cleaning of the chimney connector since this inspection is most conveniently done through the flu...

Страница 25: ...64 62 19 56 60 59 22 56 58 54 23 25 48 49 50 45 53 42 41 53 24 28 57 26 27 38 18 17 14 16 46 65 62 44 43 40 39 34 35 70 33 31 32 30 28 42 29 15 71 36 5 6 75 76 77 77 78 27 80 MHSC reserves the right...

Страница 26: ...er Pin Ashdoor 30001749 33 Ashdoor Hinge Lower 30002404 34 Ashpan 1601025 35 Ashpan Bracket 1601039 36 Ashpan Cover 1601027 37 Airwash Manifold 30002407 38 Front See Chart Pg 33 39 Left Door See Chart...

Страница 27: ...0002633 30002623 30002643 30003082 Right Side 30003053 30002612 30004877 30003063 30003073 30002632 30002622 30002642 30003083 Flue Collar 30003008 2324280 30004868 30003020 30003032 2374280 1324280 3...

Страница 28: ...d wood chemically treated wood or any fuel not recommended in the Owners Guide 4 This warranty does not cover a stove repaired by someone other than a Vermont Castings Authorized Dealer 5 Damage to th...

Отзывы: