background image

10009459

17

Brookhaven Direct Vent Gas Fireplace

Glass Information

Only glass approved by CFM Corporation 
should be used on this fireplace.

• 

The use of any non-approved replacement glass will 
void all product warranties.

• 

Care must be taken to avoid breakage of the glass.

• 

Do not operate appliance with glass front 
removed, cracked or broken.

• 

Replacement glass (complete with gasket and 
window frame) is available through your CFM 
Corporation dealer and should only be installed 
by a licensed qualified service person.

Operating Instructions

Cast Front Panel

Attach the cast 
panel by hook-
ing onto top of 
fireplace.

To remove the 
cast front assem-
bly, pull cast front 
up then lift out.

Glass Cleaning

It is necessary to clean the glass periodically.  During 
start-up condensation, which is normal, forms on the 
inside of the glass and causes lint, dust and other 
airborne particles to cling to the glass surface.  Also 
initial paint curing may deposit a slight film on the glass.  
It is therefore recommended the glass be cleaned 
two or three times with a non-ammonia household 
cleaner and warm water (gas fireplace glass cleaner 
is recommended). After the initial cleaning process the 
glass should be cleaned two or three times during each 
operating season depending on the environment in the 
house.

Clean the glass after the first two weeks of 
operation.
Do not clean glass when hot.
Do not use abrasive cleaners.
Do not strike or slam the glass.

FP1628
Cast front assy
5/06

Cast Front

FP1628

Fig. 29

  Remove 

cast front by lifting 
up then out.

Window Frame Assembly Removal

1.  Turn the fireplace OFF (including the pilot).
2.  If the unit has been operating, allow time for the 

components to cool.

3.  Remove cast front assembly.
4.  Unlock the frame window by removing the two (2) 

machine screws at the top corners of the window 
frame.

5.  Unlock the frame window by pulling the handle of the 

two latches at the bottom part of the window frame. 
Pull the left latch counterclockwise and the right 
latch clockwise.

6.  Pull the bottom of the glass frame assembly out and 

slide the top of the frame assembly out the slot at 
the top.

7.  To replace the window frame assembly, reverse this 

procedure.

������
�����������������
����

Machine 

Screw

Machine 

Screw

Pull Left 

Side Latch 

Counter-

clockwise

Pull Right 

Side Latch 

Clockwise

FP1629

Fig. 30

  Window frame assembly removal.

Содержание Brookhaven 20DVT

Страница 1: ...the re department WARNING IF THE INFORMATION IN THIS MANUAL IS NOT FOLLOWED EXACTLY A FIRE OR EXPLO SION MAY RESULT CAUSING PROPERTY DAMAGE PER SONAL INJURY OR LOSS OF LIFE PLEASE READ THIS MANUAL BEF...

Страница 2: ...Gas Line Installation 6 General Venting Information General Venting 7 General Venting Information Termination Location 8 General Information Assembling Vent Pipes 9 Flex Vent Pipes 9 Twist Lock Pipes...

Страница 3: ...on and ventilation air must not be ob structed in any way 11 When replace is installed directly on carpeting vinyl tile or any combustible material other than wood the replace must be installed on a m...

Страница 4: ...ions L 31 806 mm M 44 1140 mm N 23 587 mm O 21 540 mm P 34 864 mm Q 15 394 mm 20DVT Fireplace Dimensions Fig 2 Fireplace speci cations and framing dimensions O Rough Opening Width K F Q Rough Opening...

Страница 5: ...From Side Ref Leg Depth Ref of Comb Opening F 12 305 mm K 12 305 mm G 9 229 mm L 9 229 mm H 6 152 mm M 6 152 mm I 4 102 mm N 4 102 mm J 3 76 mm O 3 76 mm Fig 3b Combustible mantel leg minimum installa...

Страница 6: ...r elevations above 4 500 feet 1 370m in USA installations must be in accordance with the cur rent ANSI Z223 1 NFPA 54 and or local codes hav ing jurisdiction In Canada please consult provincial and or...

Страница 7: ...tall switch into receptacle box Attach cover plate to switch 3 Connect wiring to gas valve Fig 6 TPTH TH TP FP1218 Remote switch wiring 8 02 Remote ON OFF Switch FP1218 Fig 6 Remote switch wiring diag...

Страница 8: ...91cm 3 91cm J Clearance to nonmechanical air supply inlet 6 15cm for appliances 10 000 6 15cm for appliances to building or the combustion air inlet to any Btuh 3kW 12 30cm for 10 000 Btuh 3kW 9 othe...

Страница 9: ...e Apply High Tem perature Sealant Hose Clamp FP1471a Fig 8 Apply high temperature sealant to 4 and 7 pipes Outside Corner Inside Corner Termination Clearances Termination clearances for buildings with...

Страница 10: ...k Pipes When using CFM Corporation twist lock pipe it is not necessary to use sealant on the joints The only areas of the venting system that need to be sealed with high temperature silicone sealant a...

Страница 11: ...duced to 17 5 2 m In Figure 13 Dimension A plus B must not be greater than 17 5 2 m The maximum number of 45 elbows permitted per side wall installation is two 2 These elbows can be installed in eithe...

Страница 12: ...p i e from the elbow to the outside wall nish plus 2 or the distance required if installing a second 90 elbow Fig 18 Always install horizontal venting on a level plane X X FP1181 Fig 17 Vertical heigh...

Страница 13: ...pacer springs 6 165mm FP1475 flex 90 bend 4 04 djt FP1475 Fig 20 Bend ex vent at 90 so horizontal portion is 6 165 mm off top of unit STEP 4 Install the 4 102 mm ex vent pipe to the appliance collar a...

Страница 14: ...the horizon tal plane the maximum horizontal length must be reduced by 18 450 mm Example Maximum horizontal length No elbows 10 3 m 1 x 45 elbow 8 5 2 6 m 2 x 45 elbows 7 2 1 m A minimum of an 8 2 5m...

Страница 15: ...In all cases the opening must provide a mini mum of 1 25 mm clearance to the vent pipe i e the hole must be at least 9 x 9 240 x 240 mm 5 Place replace into position 6 Place restop s 7DVFS or Attic In...

Страница 16: ...r Vent to Vertical Vent 90 Elbow 7TDV90 Vertical Horizontal Offset Telescopic vent sections 7TDVP1117 11 to 17 adjustable length 7TDVP3567 35 to 67 adjustable length Pipe sections for vertical or hori...

Страница 17: ...onia household cleaner and warm water gas replace glass cleaner is recommended After the initial cleaning process the glass should be cleaned two or three times during each operating season depending...

Страница 18: ...n of Logs The logs are fragile and should be handled with care Keep the packaging material out of the reach of children and dispose of the mterial in a safe manner The individual logs can be easily id...

Страница 19: ...tating the Hi Lo adjustment knob located near the centre of the gas control Fig 33 or 34 Flame Characteristics It is important to periodically perform a visual check of the pilot and the burner ames C...

Страница 20: ...tly B BEFORE LIGHTING smell all around the heater area for gas Be sure to smell next to the oor because some gas is heavier than air and will settle on the oor WHAT TO DO IF YOU SMELL GAS Do not try t...

Страница 21: ...rning no gas to A Wall switch or wires defective Check wall switch and wires for proper connections main burner Jumper wires across terminals at wall switch if burner comes on repalce defective wall s...

Страница 22: ...m assembly FC107 D E F FC108 SIT regulator conversion 10 03 OF F P I L O T O FC108 Fig 38 Replace regulator Burner Ori ce Conversion 1 Remove two 2 burner housing assembly mounting screws Fig 39 2 Lif...

Страница 23: ...stall conversion pilot ori ce 4 Reinstall pilot hood and be sure to align with index tab 5 Turn the gas supply valve and gas valve on and test for leaks Use a 50 50 solution of liquid soap and water t...

Страница 24: ...May Be HOT 1 Turn off pilot light at gas valve side 2 Let replace cool if it has been running 3 Remove window frame assembly Refer to Window Frame Assembly Removal section 4 Remove logs 5 Vacuum burn...

Страница 25: ...a 1b 2 3 4 5 7a b 8a b 12 13 9 14 10 16 17 18 20 21 22 24 9459 20DVT parts 5 06 19 15 Ref Description 20DVT 1 Log Set Complete 10009451 1a Log Rear J11 1b Log Front J12 2 Lava Rock Pkg 10001454 3 Embe...

Страница 26: ...ctrode Ignitor w Cable RN RP 10001297 15 Ignitor Piezo w Nut 50932 16 Valve SIT 820 662 RN 20010563 17 Flexible Gas Line w ON OFF Shut Off Valve 10009064 18 Frame Window w Glass Assy 10009485 19 Conso...

Страница 27: ...nd supported Installation Instructions 1 Remove window frame assembly and logs 2 Place rear ceramic panel in back of unit Fig 44 3 Place side panels 4 Re install logs and window frame assembly Optiona...

Страница 28: ...Brookhaven Direct Vent Gas Fireplace 28 10009459...

Страница 29: ...10009459 29 Brookhaven Direct Vent Gas Fireplace...

Страница 30: ...Brookhaven Direct Vent Gas Fireplace 30 10009459...

Страница 31: ...p Ifuponinspection thedamageisfoundtobethefaultofthemanufacturer repairs will be authorized at no charge to the customer parts and or labor Any part and or component replaced under the provisions of t...

Страница 32: ...Ratings EnerGuide Ratings D O E Model Fireplace Ef ciency Steady State AFUE 20DVTRN 60 1 80 64 20DVTRP 60 1 81 64 410 Admiral Blvd Mississauga Ontario Canada L5T 2N6 800 668 5323 www cfmcorp com CFM C...

Отзывы: