background image

- 35 -

1.

Slide fan assembly from the left side into fireplace
opening, line up mounting holes with screw studs on
back of fireplace and fasten with #10-24 hex nuts.

2.

Install thermal sensor on bottom of firebox using
#10-24 hex nuts.

3.

(Option A) - Place electronic fan speed control
box on bottom of fireplace base, lining up mounting
holes with screw studs.  Fasten fan speed  control
box with #10-24 hex nuts.
(Option B) -  The speed control can be installed in
an electrical box at normal wall switch height for
convenient access.

4.

Remove electrical knockout on the side of the
fireplace. (See hard wire or receptacle hook up
instructions).

5.

Whether wiring directly to the fan junction box
(Option A) or into the EB1 (electrical receptacle box,
P/N ZA1200, Option B) first ensure cable is secured
using box connector.

OPTIONAL FAN KIT - FK24

Fan Specifications:  115 Volt 60 HZ 56W

This fan does not need regular maintenance, however
periodic cleaning is required.  Check the area under the
control door and in front of the fan and wipe or vacuum
at least once a month during the operating season.

Should this fan require servicing, the
power supply must be disconnected.

The FK-24 comes with the electrical
cord attached.

C

B

A

Black
White

Ground

A: SPEED CONTROL
B: TEMPERATURE SENSOR
C:  FAN

WIRING INSTRUCTIONS

THE FIREPLACE, WHEN INSTALLED MUST BE
ELECTRICALLY CONNECTED AND GROUNDED IN
ACCORDANCE WITH LOCAL CODES OR, IN THE
ABSENCE OF LOCAL CODES, WITH THE CURRENT
CSA C22.1 CANADIAN ELECTRICAL CODE or for
U.S.A. INSTALLATIONS
, FOLLOW LOCAL CODES AND
THE NATIONAL ELECTRICAL CODE, ANSI/NFPA NO.
70.

Hard (DIrect) Wire Hook-Up

First connect ground wire to ground stud located on the
base of either box.  Black wire from supply should connect
to the variable speed switch.  Alternate speed switch wire
connects to temperature sensor.  Alternate lead from
sensor connects to fan.  Alternate fan lead connects back
to the white supply wire. (Fig. 74).

1. Remove 2" knock out.  Slide the electrical box back plate

into the back and bottom lances (clips) while fitting the
box connector into the knock out.  Fasten into place with
fastening screws provided. Fig. 52.

2. Connect the black positive wire to brass screw (polar-

ized side) of the receptacle.  The white wire is connected
to the chrome screw.  The ground wire is connected to
the green ground screw of the receptacle.  Fit the
receptacle into the electrical box.

3. Screw the cover plate provided to the electrical box.
4. Plug in the FK24 Fan Kit.

Fig. 73

Fig. 75

Fig. 74

FAN SPEED SWITCH

VALVE

GAS

LINE

ELECTRICAL

BOX

FAN

THERMAL SENSOR

ELECTRICAL BOX

GAS INLET HOLE

INSIDE VIEW

FASTENING 

SCREWS

OUTSIDE VIEW

OPTIONAL BAY WINDOW INSTALLATION

1. Remove existing bottom louvre and hinges from fire-

place.  (Set aside the two (2) self tapping screws).

2. Remove existing top louvre from fireplace.
3. Remove two (2) pieces of ceramic refractory from Bay

Frame Window; considering that these are very fragile
pieces handle them with special care!

4. Assembly Bay Window Frame to Bottom Bay Louvre by

using four (4) machine screws (from top to bottom), four
(4) nuts (in the bottom) and four (4) spaces (all supplied
with the kit) through the existing four (4) holes in the
bottom of the ay Window Frame and in the top of the
Bottom Bay Louvre.  Spacers to be placed between the
Bay Window Frame and the Bottom Bay Louvre.

5. Insert two (2) pieces of ceramic refractory into the Bay

Window Frame as per drawing below.

OPTIONAL EB1 (Receptacle) Hook-Up

 Any electrical re-wiring of this fan must
be done by a qualified electrician.

Turn off all power before hook-up.

Содержание BHDR36 RN

Страница 1: ...from your neighbours phone Follow the gas suppliers instructions If you cannot reach your gas supplier call the fire department WARNING IF THE INFORMATION IN THIS MANUAL IS NOT FOLLOWED EXACTLY A FIR...

Страница 2: ...ions 15 Vertical Through the Roof Applications 15 Vertical Through the Roof Installation 16 Crimped End Venting Components 17 Assembling Twist Lock Vent Pipes 18 Rear Venting Applications 18 Rear Wall...

Страница 3: ...a qualified service person A profes sional service person should be contacted to inspect this fireplace annually Make it a practice to have all of your gas fireplaces checked annually More frequent cl...

Страница 4: ...19 483mm H 23 7 8 606mm I 27 1 2 698mm J 6 3 4 171mm K 10 254mm L 13 1 2 343mm M 41 5 8 1057mm N 58 7 8 1495mm O 29 7 8 748mm ROD 16 1 2 419mm ROW 36 1 2 927mm ROH 35 889mm FIREPLACE DIMENSIONS Fig 2...

Страница 5: ...CE TO COMBUSTIBLES 1 Choose fireplace location 2 Place fireplace into position and secure to floor with 1 1 2 screws or nails The holes to secure the fireplace to the floor are located just behind the...

Страница 6: ...th is not mandatory but it is recommended for aesthetic purposes We recommend a non combustible hearth which does not obstruct louvre opening GAS SPECIFICATIONS MAX MIN INPUT INPUT MODEL FUEL GAS CONT...

Страница 7: ...sure that wire is protected Run the other end to a conveniently located wall receptacle box 2 Attach wire to switch and install switch into receptacle box Attach cover plate to switch 3 Connect wiring...

Страница 8: ...may be opened 12 306mm C clearance to permanently closed window minimum 12 inches 305mm recommended to prevent con densation on window D vertical clearance to ventilated soffit located above the termi...

Страница 9: ...of 48 1219mm for recessed location D Minimum width for back wall of a recessed location Combustible 38 965mm Noncombustible 24 610mm E Clearance from corner in recessed location Combustible 6 152mm No...

Страница 10: ...M 12 Adjust sleeve to maximum 10 3 8 x 9 3 8 and attach to firestop with 8 sheet metal screws supplied Fig 15 Install firestop assembly STEP 3 Measure from fireplace collar face to face of outside wal...

Страница 11: ...between vertical and horizontal side wall venting will help to determine the various vent lengths allowable Fig 21 Minimum clearance between vent pipes and combustible materials is one 2 inch 25 mm o...

Страница 12: ...5 degree elbows are installed on the vertical part of the vent system If a 90 degree elbow is used in the horizontal vent run level height maintained the maxi mum horizontal vent length is reduced by...

Страница 13: ...nsion from the floor of the unit is 7 feet 214cm the horizontal run to the face of the outer wall must not exceed 8 1 2 feet 259cm SIDEWALL VENTING GRAPH Dimensions in Feet VENT SIDEWALL INSTALLATION...

Страница 14: ...restrict cold air being drawn in around fireplace Fig 26 Fig 28 X X 7DVRT90 ENSURE PIPES ARE CONCENTRIC BEAD OF SEALANT STEP 5 Fig 28 Usetheappropriatelength of pipe section telescopic or fixed and in...

Страница 15: ...so as to maintain a 4 clearance below snorkel Fig 30 DO NOT BACK FILL AROUND SNORKEL SOIL SHOULD NOT BE LESS THAN 4 BELOW SNORKEL FOUNDATION RECESS SNORKEL SCREWS WALL SCREWS SHEET METAL WATERTIGHT S...

Страница 16: ...collar and seal around the pipe 10 Add additional vent lengths for proper height Fig 36 11 Apply high temperature sealant to 4 and 7 collars of vent termination and install VERTICAL THRU THE ROOF INST...

Страница 17: ...Applications 7DVT45 for Vertical Installation Offsets 90o transition elbow kit 7DVRT90 for Vertical Sidewall Applications or thru the roof Telescopic vent sections 7DVP610 6 to 10 adjustable length 7D...

Страница 18: ...ars off the fireplace with high tem perature sealant and 3 screws 2 If you wish to continue your system with your 4 7 crimped pipe or elbow apply high temperature sealant on crimped end of pipe at 2 i...

Страница 19: ...ION 7DVRVT Fig 42 STEP 4 If the fireplace has crimped ends on the inner and outer flue collars apply a bead of high temperature sealant and using the appropriate venting component s attach to the fire...

Страница 20: ...ut can be located any where in the vent system to meet the perim eters identified in the venting graph SIDE VIEW MAXIMUM 20 ft 6100mm 90 2286mm VERTICAL DIMENSION 7 5 ft MINIMUM WHEN HORIZONTAL RUN IS...

Страница 21: ...etermine the height of the centre of the horizontal vent pipe exiting through the outer wall Using this dimension on the Sidewall Vent Graph Fig 47 locate the point it intersects with the slanted grap...

Страница 22: ...Fig 49 STEP 2 Fig 51 Measure wall thickness and cut adjustable zero clearance sleeve parts to proper length MAXIMUM 12 Adjust sleeve to minimum 9 3 8 x 9 3 8 and attach to firestop with 8 sheet metal...

Страница 23: ...allation depth of down to 7 inches 178mm below grade level The 7 inches is measured from the centre of the horizontal vent pipe as it penetrates through the wall If venting system is installed below g...

Страница 24: ...ntal run For each 45o elbow used on the horizontal level the maximum horizontal length must be reduced by 18 inches Example Maximum horizontal length 0 45o elbows 10 ft 1 45o elbows 8 5 ft 2 45o elbow...

Страница 25: ...upper flange of flashing is below the shingles Fig 64 8 Install appropriate pipe sections until above the flash ing See Fig 62 for s 7 8 and 9 9 Install storm collar and seal around the pipe 10 Add a...

Страница 26: ...ade Installation 45o elbow kit 7TDV45 for Vertical Horizontal Offsets 90o transition elbow kit 7TDVRT90 for Vertical Sidewall Applications or thru the roof Telescopic vent sections 7TDVP1218 12 to 18...

Страница 27: ...s 3 Under no circumstances should this appliance be operated without the front glass or with a broken glass Replacement of the glass with gasket as supplied by themanufacturershouldbedonebyalicencedqu...

Страница 28: ...right log BH4 onto locator notches Ensure log is secure LAVA ROCK The lava rock provided with this fireplace must be placed on the firebox base on either side of the burner assembly Under no circumsta...

Страница 29: ...eriodically perform a visual check of the pilot and the burner flames Com pare them to the pictorials illustrated below Fig 70 71 and 72 If any of the flames appear abnormal call a service person INSP...

Страница 30: ...rame Removal in manual 8 Visibly locate pilot by the main burner 9 Turn knob on gas control counterclockwise to PILOT C Use only your hand to push in or turn the gas control knob Never use tools If th...

Страница 31: ...ADJUST PILOT FLAME HEIGHT ALL WIRING CONNECTIONS REPLACE THERMOPILE THERMOCOUPLE NEEDS A MINIMUM OF 14mV DEFECTIVE VALVE TURN TO PILOT METER SHOULD READ GREATER THAN 100 mV IF NOT REPLACE PILOT LIGHTS...

Страница 32: ...IEZO IGNITOR GENERATES SPARK ELECTRODE CABLE NOT GROUNDED PILOT STAYS ON FLAME ENGULFING THERMOCOUPLE BY 3 8 THERMOCOUPLE ATTACHED TO VALVE MNIMUM MILLIVOLT OPEN CIRCUIT 18MV CLOSED CIRCUIT 5MV VENT S...

Страница 33: ...w fittings 10001296 12 Manifold Tubing w fittings 57318 13 Thermocouple SIT 53373 14 Thermocouple PSE 10001825 15 Thermopile 51827 16 Electrode Ignitor w cable SIT 10001297 17 Ignitor Piezo SIT 52464...

Страница 34: ...4 a b 17 16 11 9 15 13 31 32 33 30 30 29 21 23 19 a b 5 a b 34 2 28 36 35 12 L O H I PILOT ADJ P I L O T ON OFF 7 a b 20 a b 18 8 a b 3 6 a b 10 15 14 1 COMPLETE LOG SET 1 COMPLETE LOG SET 1c 1d 1b 1a...

Страница 35: ...ither box Black wire from supply should connect to the variable speed switch Alternate speed switch wire connects to temperature sensor Alternate lead from sensor connects to fan Alternate fan lead co...

Страница 36: ...ndow screen is cool enough to handle To remove the Frame Window Screen 1 Lift the frame window screen moving it parallel to the glass 2 Move the bottom side of the frame window screen away from the gl...

Отзывы: