Vermont Castings • Apsen C3 Installation Manual_R2 • 2019 - ___ • 07/19
7
8390-950i
ATTENTION INSTALLER:
Follow this Standard Work Checklist
This standard work checklist is to be used by the installer in conjunction with, not instead of, the instructions contained in this installation manual
Customer:
Date Installed:
Lot/Address:
Location of Appliance:
Installer:
Dealer/ Distributor Phone #:
Serial #:
Model :
WARNING! Risk of Fire or Explosion!
Failure to install appliance according to these instructions can lead to a fi re or explosion.
Appliance Install
YES
IF NO, WHY?
Verifi ed clearance to combustibles.
Appliance is leveled and connector is secured to appliance.
Hearth extension size/height decided.
Outside Air Kit Installed.
Floor protection requirements have been met.
If appliance is connected to a masonry chimney, it should be cleaned and
inspected by a professional. If installed to a factory built metal chimney,
the chimney must be installed according to the manufacturer’s instructions
and clearances.
Chimney
Chimney confi guration complies with diagrams.
Chimney installed, loked and secured in place with proper clearance.
Chimney meets recommended height requirements (16 Feet).
Roof fl ashing installed and sealed.
Terminations installed and sealed.
Clearances
Combustible materials not installed on non-combustible areas.
Verifi ed all clearances meet installation manual requirements.
Mantels and wall projections comply with installation manual requirements.
Protective hearth strips and hearth extensions installed per manual
requirements.
Appliance Setup
All packaging and protective materials removed.
Firebrick, baffl e and ceramic blanket insalled correctly
All labels have been removed from the door.
All packaging materials are removed from inside/under the appliance.
Manual bag and all of its contents are removed from inside/under the
appliance and given to the party responsible for use and operation.
Hearth & Home Technologies recommends the following:
• Photographing the installation and copying this checklist for your fi le.
• That this checklist remain visible at all times on the appliance until the installation is complete.
Comments:
Further description of the issues, who is responsible (Installer/Builder/Other Trades, etc.) and corrective action needed:
Comments
communicated
to
party
responsible
by
on
(Builder/Gen. Contractor)
(Installer)
(Date)
F. Install Checklist