3
Slide the blue tab forward to unlock the intermediate rail.
4
Pull the intermediate portion of rail the rail forward. Ensure that the ball bearing
retainer on the intermediate rail is locked forward.
Note:
You do not need to extend the rails as far as they can possibly extend.
You only need sufficient space to place the appliance into the rails.
Installation procedures
Installing the appliance into a rack
32
Содержание NetBackup 5240
Страница 1: ...NetBackup Appliance Hardware Installation Guide Release 2 7 3 NetBackup 5240 Document Revision 1 ...
Страница 4: ......
Страница 22: ...Preinstallation requirements Prerequisites for IPMI configuration 22 ...
Страница 42: ...Installation procedures Connecting a 4TB appliance to more than one storage shelf 42 ...
Страница 43: ...43 Installation procedures Connecting a 4TB appliance to more than one storage shelf ...
Страница 66: ...Installation procedures Accessing and using the Veritas Remote Management interface 66 ...
Страница 140: ...Adding storage shelves to an operating 4TB appliance that has at least one storage shelf attached Recabling 140 ...