11
In the bottom I/O module of the second shelf, connect another SAS-3 cable to
port A.
12
Be sure that the blue clip on the connector in this port points up.
Next, connect network and power cables. Turn on the storage shelves and the
appliance per the required sequence. Verify that all units are functioning correctly.
Connecting three storage shelves to an appliance
Note:
The cables in the following diagrams are shown in different colors for
demonstration purposes only. The actual cables are black.
101
Adding one or more storage shelves to an operating 4TB appliance that does not have any storage shelves
Connecting three storage shelves to an appliance
Содержание NetBackup 5240
Страница 1: ...NetBackup Appliance Hardware Installation Guide Release 2 7 3 NetBackup 5240 Document Revision 1 ...
Страница 4: ......
Страница 22: ...Preinstallation requirements Prerequisites for IPMI configuration 22 ...
Страница 42: ...Installation procedures Connecting a 4TB appliance to more than one storage shelf 42 ...
Страница 43: ...43 Installation procedures Connecting a 4TB appliance to more than one storage shelf ...
Страница 66: ...Installation procedures Accessing and using the Veritas Remote Management interface 66 ...
Страница 140: ...Adding storage shelves to an operating 4TB appliance that has at least one storage shelf attached Recabling 140 ...