Locate the power sockets in the appliance.
7
Connect one cable between each socket and a socket on the Power Distribution
Unit (PDU) for your rack.
Turning on the hardware and verifying operation
If you have turned off your appliance you must wait to turn it on again. The appliance
and the attached storage shelves must be turned on in a specific order. If the
hardware is not turned on correctly the appliance RAID controller may not recognize
some storage units.
If you have turned off your appliance you can begin turning on storage shelves.
Use the following procedure to turn on the storage shelves in the required order.
To turn on the 3U16 storage shelves
1
Start with the storage shelf that is farthest in distance from the appliance.
2
Flip on the power switches on each power supply on the rear of the shelf.