The hardware must be turned off before you add any storage shelves.
Turning off the existing hardware
You must turn off the existing system before you turn on any Expansion Shelves.
Be sure to perform these steps in the order that they are presented.
To turn off the existing hardware
1
Perform a soft shutdown of any compute nodes.
If you have two compute nodes you must shut them down separately.
■
From the NetBackup Appliance Shell Menu, enter
Support > Shutdown
.
From the Flex Appliance Shell, enter
system > shutdown
.
■
Verify that the compute node is completely turned off. All LEDs are off. Fans
are not running.
■
Repeat these steps for the second compute node if applicable.
2
After the compute nodes are turned off you must manually turn off the Primary
Shelf.
■
Locate the on/off switches on the two power supplies on the rear of the
Primary Shelf.
■
Press the switches to off.
91
Adding Expansion Storage Shelves to an operating appliance that does not have any Expansion shelves
Turning off the existing hardware
Содержание 5350
Страница 1: ...Veritas 5350 Appliance Hardware Installation Guide ...
Страница 13: ...The bottom drawer contains slots 42 through 83 13 Hardware overview 5U84 storage shelf drawers and disk drives ...
Страница 64: ...64 Hardware installation procedures Connecting the hardware to one compute node ...