![VERDER CARBOLITE GERO RHF 15/15 Скачать руководство пользователя страница 8](http://html.mh-extra.com/html/verder/carbolite-gero-rhf-15-15/carbolite-gero-rhf-15-15_installation-operation-and-maintenance-instructions_1003683008.webp)
Key
A
Duct (75mm-150mm diameter)
B
Ambient air is drawn into duct
C
Chimney
D
25mm vertical gap between chimney and duct
2.4
Heating Elements
The silicon carbide elements are VERY FRAGILE and are packed separately. Fit them
accordingly to the instructions in section 6.0 for element fitting and replacement
instructions.
2.5
Electrical Connections
Connection by a qualified electrician is recommended.
The product covered by this manual normally requires a single phase A.C. supply,
which may be Live to Neutral non-reversible, Live to Neutral reversible or Live to Live.
Some models may be ordered for 3-phase use, which may be with or without neutral.
Check the product rating label before connection. The supply voltage should agree with
the voltage on the label and the supply capacity should be sufficient for the current on
the label.
The supply should be fused at the next size equal to, or higher than the current on the
label. This manual contains a table of the most common fuse ratings.
When the mains cable is factory fitted, internal fuses are also fitted. It is essential that
the operator ensures that the product is correctly fused.
Products with a factory fitted supply cable are designed to be wired directly to an
isolator or fitted with a line plug.
Products without a factory fitted supply cable require a permanent connection to a
fused and isolated supply. The product's electrical access panel should be temporarily
removed, and connections made to the internal terminals.
8
Содержание CARBOLITE GERO RHF 15/15
Страница 32: ......
Страница 33: ...Notes Service Record Engineer Name Date Record of Work ...