2.0
Installation
2.1
Unpacking and Handling
When unpacking or moving the product, always lift by its base; do not use the door or
any other projecting cover or component to support the equipment when moving it.
Use a fork lift or pallet truck to move the product; position the product on a level
surface and use an adequate number of personnel to safely move the product into
position.
Carefully remove any packing material from inside and around the product before use.
Avoid damaging the surrounding insulation when removing packing materials.
Locate the shelves as required.
Some models may be lifted by fitting lifting bolts to captive threads which are fitted in
the top of the case, whilst others may have welded on lifting eyes.
NOTE: This product contains Refractory Ceramic Fibre (also known
as Alumino Silicate Wool - ASW). For precautions and advice on
handling this material see section 6.2.
2.2
Siting and Setting Up
Note:
This LGP oven is supplied with a floor stand that elevates it approximately 500
mm off the ground.
Place the product on a level surface in a well ventilated area.
Site away from other sources of heat and on a non-flammable surface that is resistant
to accidental spillage or hot materials.
The surface on which the equipment is mounted should be stable and not subject to
movement or vibrations.
The height of the mounting surface is important to avoid operator strain when loading
and unloading samples.
Unless otherwise stated elsewhere in this manual, ensure that there is
at least 150
mm
of free space around the back and sides of the product. Clear space is required
above the product to dissipate heat.
5
Содержание CARBOLITE GERO LGP 7/730
Страница 24: ......
Страница 25: ...Notes Service Record Engineer Name Date Record of Work ...