C.
Rear Internal Lighting
1.
Rear
lighting
does not
illuminate
when
instrument
switch is
on and the
computer
connected
and the
software is
running.
The 'Back light is off
temperature' is lower than
the standby temperature
Increase the 'Back light off
temperature' to a value greater
than the standby temperature
The process temperature is
greater than the 'Back light
off temperature'
Allow the furnace to cool below
the 'Back light off temperature'
Increase the 'Back light off
temperature' to a value greater
than the process temperature
2.
Rear
lighting
does not
illuminate
when
instrument
switch is
on and the
computer
is not
connected.
No signal to switch lights on
from the controller
The controller is faulty
LED's faulty
Investigate or contact Carbolite
Gero
Faulty Wiring
Investigate or contact Carbolite
Gero
D.
Computer Software
1.
No image in
software
sample
window
from the
camera
Camera status
indicator is
showing red as
disconnected
Check the furnace instrument switch is
turned on
Check all the Ethernet cable connections
Close the CAF software and restart
Camera Faulty
Contact Carbolite Gero
2.
No
temperature
readings
shown in the
command
window
Controller status
indicator is
showing red as
disconnected
Check the furnace instrument switch is
turned on
Check all the serial cable connections
Close the CAF software and restart
58
Содержание CARBOLITE GERO CAF G5
Страница 63: ...Fig 3 Front Tube Seal Assembly Fig 4 Door Arm Assembly 63 ...
Страница 64: ...Fig 5a Camera Mounting Bracket Fig 5b Lens and Camera Assembly 64 ...
Страница 65: ...Fig 5c Sliding the Camera Mounting Bracket Assembly onto the Door Arm 65 ...
Страница 66: ...Fig 5d Securing the Camera Mounting Bracket Assembly to the Door Arm 66 ...
Страница 67: ...Fig 5e Mounting the Lens and Camera Assembly 67 ...
Страница 68: ...Fig 5f Lens and Camera Assembly in Position 68 ...
Страница 69: ...Fig 6a Rear View of the Standard CAF G5 Furnace Showing Brick Box Assembly 69 ...
Страница 70: ...Fig 6b Rear View of the CAF G5 Biomass Furnace with Rear Illumination Showing Brick Box Assembly 70 ...
Страница 71: ...Fig 7 Front Tube Seal Position 71 ...
Страница 72: ...Fig 8 Tube End Seal Assembly Tightening Sequence Fig 9 Work Tube Front Support 72 ...
Страница 73: ...Fig 10 Fitting the Door Arm Assembly Fig 10a Adjusting the Door Arm Assembly 73 ...
Страница 74: ...Fig 11a Furnace Case and Controls 74 ...
Страница 75: ...Fig 11b Gas Inlet Pipe Fig 12 Positioning the Furnace 75 ...
Страница 76: ...Fig 13a Positioning Samples on the Sample Carrier Fig 13b Loading Samples into the Mouth of the Work Tube 76 ...
Страница 77: ...Fig 13c Loading Samples into the Work Tube 77 ...
Страница 78: ...Fig 16 File Folder 78 ...
Страница 79: ...Fig 17 Door Arm Assembly Exploded View 79 ...
Страница 82: ...SST DT HT FT Fig 18 Report Sheet Page 2 Side View Plan View Fig 19 Formed Wire Sample 82 ...
Страница 83: ...Fig 20 Sample Carrier Sample Tiles and Sample Positions 83 ...
Страница 84: ...Fig 21a Coal and Coke Test Piece Mould Fig 21b Biomass Test Piece Mould and Hand Press 84 ...
Страница 85: ...Fig 22 Sample Loading Tool Fig 23 Camera Ethernet Connection 85 ...
Страница 86: ...Fig 24 LED Driver Connection 86 ...
Страница 87: ...Notes Service Record Engineer Name Date Record of Work ...