3.0
Operation
3.1
Operating Cycle
1. Plug the furnace in with the plug supplied.
2. Switch on the mains isolator.
3. The temperature controller will illuminate and start its test cycle.
4. Press "ON".
5. The "FURNACE ON" light will be on, and the furnace will start to heat up to the
pre-set program in the Eurotherm 3508 to ISO 12981-1
6. The "GAS ON" light will be on, and gas will flow into the glass retort.
11
Содержание 3508
Страница 34: ......
Страница 35: ...Notes Service Record Engineer Name Date Record of Work ...