Vents 100 Base Скачать руководство пользователя страница 1

AXIAL FAN

USER’S MANUAL

                       www.ventilation-system.com

Base

EN

Содержание 100 Base

Страница 1: ...AXIAL FAN USER S MANUAL www ventilation system com Base EN...

Страница 2: ...9 Operation guidelines 9 Designation key 10 Installation and set up 12 Connection to power mains 14 Electronics operation algorithm 16 Technical maintenance 17 Troubleshooting 18 Storage and transport...

Страница 3: ...nd practical training in the field of ventilation systems and should be able to work in accordance with workplace safety rules as well as construction norms and standards applicable in the territory o...

Страница 4: ...the unit Disconnect the unit from the power supply prior to any connection servicing maintenance and repair operations Only qualified electricians with a work permit for electrical units up to 1000V a...

Страница 5: ...st not contain any dust or other solid impurities sticky substances or fibrous materials Do not use the unit in a hazardous or explosive environment containing spirits gasoline insecticides etc Do not...

Страница 6: ...aracteristics design or configuration of its products at any time in order to incorporate the latest technological developments Never touch the unit with wet or damp hands Never touch the unit when ba...

Страница 7: ...e of the unit by a person responsible for their safety Children should be supervised to ensure that they do not play with the unit Connection to the mains must be made through a disconnecting device w...

Страница 8: ...damaged it must be replaced by the manufacturer its service agent or similarly qualified persons in order to avoid a safety hazard Precautions must be taken to avoid the back flow of gases into the r...

Страница 9: ...the unit casing The fan design is constantly being improved thus some models may be slightly different from those described in this manual WARNING The decorative front panel must be purchased separat...

Страница 10: ...motor Q1 low noise motor with high performance Modifications K KO non return valve K1 KO1 non return valve Options V pull cord switch T turn off delay timer VT pull cord switch and turn off delay tim...

Страница 11: ...11 EN B D H C L N Model D B N L H C 100 Base I 99 mm 140 mm 88 mm 101 mm 103 mm 56 mm 125 Base I 124 mm 165 mm 88 mm 101 mm 125 mm 70 mm...

Страница 12: ...an by turning it counter clockwise Mark the holes for fixing the fan and the power cable QF L N Lead the power cable to the ventilation hole drill the mounting holes and install the dowels Fix the fan...

Страница 13: ...panel Supply power to the fan The decorative panel is not included in the delivery set and is purchased separately for the fan 1 2 2250 2250 750 750 600 600 R600 1 2 3 1 1 3 3 2 2 2 2 1 2 2 The unit w...

Страница 14: ...onnection to single phase AC 220 240 V 50 60 Hz power mains Terminal designations on wiring diagrams L line LT timer control line S ON OFF switch N neutral QF automatic circuit breaker Base I QF L L N...

Страница 15: ...15 EN Base I T TH 60 90 H 2min 30min T N QF LT N L L S Base I V QF L L N N DO NOT USE A METAL SCREWDRIVER KNIFE ETC FOR ADJUSTMENT OPERATIONS NOT TO DAMAGE THE CIRCUIT BOARD...

Страница 16: ...to 30 minutes To set the maximum humidity setpoint 90 set the potentiometer to Hmax position To adjust the fan turn on delay time turn the control knob T clockwise to increase and counter clockwise t...

Страница 17: ...upply and make sure electricity has been turned off Remove the front panel Clean the fan with a soft dry cloth or a brush Wash the front panel under running water Wipe the fan surfaces dry Attach the...

Страница 18: ...ported only in the working position Avoid sharp blows scratches or rough handling during loading and unloading Prior to the initial power up after transportation at low temperatures allow the unit to...

Страница 19: ...air includes work specific to elimination of faults in the unit operation to ensure its intended use by the user within the guaranteed period of operation The faults are eliminated by means of replace...

Страница 20: ...unit warranty period Violation of the unit transportation regulations by the user Violation of the unit storage regulations by the user Wrongful actions against the unit committed by third parties Un...

Страница 21: ...21 EN Quality Inspector s Stamp Manufacture Date Sold by name and stamp of the seller Purchase Date...

Страница 22: ...22 EN...

Страница 23: ...23 EN...

Страница 24: ...V160 1EN 06 Certificate of acceptance The fan is recognized as serviceable V L 100 Base T K turbo 220V 60Hz 125 Base I VT K1 Q TH Q1 VTH...

Отзывы: