GENERAL OPERATION
Operation - 17
10. Install counterweights on the rear of the power
unit (six Ventrac weights or 250 pounds (113 kg).
11.
3-N-1 Hitch for 3-Point Hitch
Weight Bar for Standard Hitch or 3-Point Hitch
Move the power unit’s steering cylinder to the
outer hole position in the rear frame.
12. Adjust tire pressure to the upper range of the
recommended tire pressure for your specific tire.
Do not over-inflate. Refer to power unit operator’s
manual for maximum tire pressure.
13. Start the power unit engine, engage the PTO
switch, and raise the loader slightly.
14. Remove the cylinder prop pins, lift the cylinder
stop props up to the operating position, and
reinstall the cylinder prop pins.
Detaching Loader from Power Unit
1.
Attention
Do not remove the loader from the power unit
without an accessory tool attached to balance the
loader during storage.
Park the power unit on a level surface and set
the parking brake.*
2. Rotate the bucket or tool until level (as shown by
level indicator rod).
3. Raise the loader arms far enough for the cylin-
der prop stops to clear the end of the cylinders
and slightly raise the power unit’s front hitch.
4.
Shut off power unit engine and engage the park
-
ing brake.
5. Remove the pins that hold the cylinder prop
stops in the raised operating position and rein-
stall the pins after the stops have been lowered
to the cylinder lock position.
* Refer to power unit operator’s manual for operation of
power unit controls.
Содержание KH500 Versa-Loader
Страница 25: ...Specifications 25 Blank Page ...
Страница 32: ...PARTS Illustrated Parts 32 Use only original Ventrac replacement parts ILLUSTRATED DRAWING Hydraulic Lift ...
Страница 34: ...PARTS Illustrated Parts 34 Use only original Ventrac replacement parts ILLUSTRATED DRAWING Hydraulic Tilt ...
Страница 38: ...PARTS Illustrated Parts 38 Use only original Ventrac replacement parts ILLUSTRATED DRAWING Hydraulic Diagram ...