Appendix A
Combination Refrigeration/Heating System
1. If boiler is used in connection with refrigeration
systems, boiler must be installed with chilled
medium piped in parallel with the heating boiler
using appropriate valves to prevent chilled
medium from entering boiler. See Figure A-1.
Also consult Residential Hydronic Heating
Installation and Design I=B=R Guide.
2. If boiler is connected to heating coils located in
air handling units where they may be exposed to
refrigerated air, boiler piping must be equipped
with flow control valves or other automatic means
to prevent gravity circulation of boiler water
during operation of cooling system.
Figure A-1: Isolated Boiler from Refrigeration System
Water
Chiller
Shut-off
Valves
Expansion
Tank
Circulator
Return main from
combined heating
& cooling system
Supply main to
combined heating
& cooling system
Shut-off Valves
REVISIONS
REV.
EN
DATE
DESCRIPTION
DWN
CHK
APVD
A
103-143-14599
12/16/2021
PRODUCTION RELEASE
EJL
TITLE:
FIRST USE:
ITEM NUMBER:
MATERIAL:
ALTA
CHILLED PIPING SYSTEM
HEAT ONLY
DES: EJL
CHK:
APVD:
SCALE: 1:14
SIZE: A
SHEET: 1 OF 1
DATE:
REVISION:
DRAWING NUMBER:
09/14/2021
TS-103-67
A
UNLESS OTHERWISE NOTED:
ALL DIMENSIONS IN INCHES.
TOLERANCES:
X.X ±.1 X.XXX ±.005
X.XX ±.03 ANGLE ±1°
PROPERTY OF
U.S. Boiler Company, Inc.
LANCASTER, PA
THIS DOCUMENT CONTAINS CONFIDENTIAL INFORMATION
AND ITS CONTENTS ARE THE SOLE PROPERTY OF U.S. BOILER
COMPANY, INC. ANY REPRODUCTION IN PART OR AS A
WHOLE WITHOUT THE WRITTEN PERMISSION OF U.S. BOILER
COMPANY, INC. IS STRICTLY PROHIBITED.
THIRD ANGLE
PROJECTION
A
A
B
B
2
2
1
1