Chapter 4 System Commissioning and Operation
ACH200 Series High Voltage Variable Frequency Speed Control System Operating Manual
40
5) Do not operate on the touch screen without training.
4.3 Pre-commissioning and Operation Inspection
Cautions
1) Ensure that there are no strange objects inside the cabinet
2) Make sure there is no water damage inside or outside the cabinet
3) Check all cables to ensure that no conductors are exposed due to abrasions or other improper
transportation, and that there is no water damage
4) Ensure that the cabinet is reliably connected to the factory floor to ensure personnel safety
5) Ensure that all user wiring is correct and tightened
6) Make sure the wiring of the high voltage AC drive is correct and the doors of the electrical
cabinets are closed as required before turning on the power, do not open the cabinet doors after
the power is turned on