vego garden VWT35 Скачать руководство пользователя страница 1

Step 4: Attach Link Poles (L1,L2,L3) and Curved Poles (C1,C2,C3) to Connectors

4

Connect the columns of Square Poles to each other using Link Poles (L1, L2, L3) and Curved Poles (C1, C2, C3.) For placement, 

refer to the diagrams, noting that horizontal poles alternate. Insert the larger Interior Plugs (H7) into the holes on the sides 

that the Links will connect to, and insert the smaller Exterior Plugs (H8) into the holes on the outside. These plugs keep 

moisture  from getting into the trellis parts.Then insert H3 bolts through the Square Poles and into Link Poles, and tighten.

L3

L2

C2

L1/L2/L3 

Or

C1

C1

L1

C3

Step 5: Plug Remaining Holes

5

Fill remaining empty holes with Plug Inserts (H6)

Trellis is complete! 

If desired, hemp ropes can be tied to the trellis to help vines climb. Hemp rope is not included, but recommended 

as it can be naturally composted once used.

Tip

+

General Manual for
Wall Trellis Systems 

Contact 

us

+1 (866) 597-1888

[email protected]

www.vegogarden.com

Houston, TX

CAUTION: 

Please be aware the metal panels may 

have sharp edges that could cause injury. The use 

of protective equipment such as gloves and closed 

toe shoes is recommended.

 

CHOKING HAZARD:

Small parts. Keep product away 

from children.

More assembly videos!

More add ons!

H6

Insert 

H6

Insert 

H6

T2

T2

T1

H1

H7

H8

H3

C1/C2/C3

H7

H8

H3

Отзывы: