5 Connecting to power supply

Conductive probe EL 2 • 

54461-EN-220324

The line break monitoring or alarm function defines the function of the 

controller in case of failure.
To realize line break monitoring with the controllers VEGATOR 131 or 

132, a supplementary electronics must be mounted in the connection 

housing of the probe.

• 

Cable colour blue - in conjunction with a VEGATOR 131, 132 

controller

1

Fig. 6: Supplementary electronics for line break monitoring in conjunction with 

VEGATOR 131, 132
1  Connection cable blue - in conjunction with the VEGATOR 131, 132, control-

lers

Mounting - Supplementary electronics

To mount the supplementary electronics, proceed as follows:
1.  Open the terminal of the probe and attach the additional electron-

ics.

2.  Connect the eyelet according to the following illustration.

Make sure that the eyelets have no contact to other metal parts.

3.  Tighten the terminal.

Содержание EL 2

Страница 1: ...Operating Instructions Conductive rod electrode Conductive probe EL 2 Document ID 54461...

Страница 2: ...description 6 3 1 Configuration 6 3 2 Principle of operation 7 3 3 Adjustment 7 3 4 Packaging transport and storage 7 4 Mounting 9 4 1 General instructions 9 4 2 Mounting instructions 9 5 Connecting...

Страница 3: ...s to the Docu ment ID By entering the Document ID on www vega com you will reach the document download Information note tip This symbol indicates helpful additional infor mation and tips for successfu...

Страница 4: ...mounting or adjustment Damage to property and persons or environmental contamination can result Also the protective characteristics of the instrument can be impaired 2 4 General safety instructions T...

Страница 5: ...xplosion proof areas Ex only devices with cor responding Ex approval may be used Observe the Ex specific safety instructions These are an integral part of the operating instructions and are enclosed w...

Страница 6: ...EL 2 1 Housing lid 2 Housing 3 Process fitting To create a measuring system you need one conductive probe and a VEGATOR 131 132 256C 631 or 632 controller The type label contains the serial number of...

Страница 7: ...ured for amplitude and phase position by the electronics of the controller and converted into a switching command EL 2 is operated with an external processing unit The connected controller powers EL 2...

Страница 8: ...on the outside Unless otherwise indicated the packages must be stored only under the following conditions Not in the open Dry and dust free Not exposed to corrosive media Protected against solar radia...

Страница 9: ...cted e g through cleaning processes or on cooled or heated vessels Fig 2 Measures against moisture ingress Do not hold EL 2 on its electrode rods Particularly with long rod ver sions the sensor can be...

Страница 10: ...4 Inflowing medium The probe should protrude into the vessel to avoid buildup For that reason avoid using high mounting bosses for screw in fittings This applies particularly to use in adhesive produ...

Страница 11: ...industrial areas shielded cable should be used Make sure that the cable used has the required temperature resist ance and fire safety for max occurring ambient temperature Use cable with round cross s...

Страница 12: ...blue in conjunction with a VEGATOR 131 132 controller 1 Fig 6 Supplementary electronics for line break monitoring in conjunction with VEGATOR 131 132 1 Connection cable blue in conjunction with the V...

Страница 13: ...minal 2 measuring electrode 3 Additional electronics for line break monitoring 4 Outer ground terminal If you are using a probe without additional electronics for line break monitoring a fault signal...

Страница 14: ...14 6 Setup Conductive probe EL 2 54461 EN 220324 6 Setup 6 1 General information You can find the setup procedure for EL 2 in the operating instructions manual of the corresponding controller...

Страница 15: ...res not be successful please call in urgent cases the VEGA service hotline under the phone no 49 1805 858550 The hotline is manned 7 days a week round the clock Since we offer this service worldwide t...

Страница 16: ...o voltage sup ply and carry out the listed steps in reverse order 8 2 Disposal Pass the instrument on to a specialised recycling company and do not use the municipal collecting points Remove any batte...

Страница 17: ...n partly insulated PTFE Electrode rod PTFE partly insulated 316Ti Alloy C4 2 4610 Materials non wetted parts Housing 316Ti Housing lid PBT Seal between housing and housing lid NBR Cable gland PA stain...

Страница 18: ...n the associated approval documents of these instruments have to be carefully noted They are part of the delivery or can be downloaded by entering the serial number of your instrument into the search...

Страница 19: ...e Schutzrechte N here Informationen unter www vega com Les lignes de produits VEGA sont globalement prot g es par des droits de propri t intellec tuelle Pour plus d informations on pourra se r f rer a...

Страница 20: ...ing scope of delivery application practical use and operat ing conditions of the sensors and processing systems correspond to the information available at the time of printing Subject to change withou...

Отзывы: