background image

1

  Introduction

This manual contains installation procedures for the Veeder-Root Overfill Alarm and Acknowledgment (Ack) 

Switch. 

The Overfill Alarm unit contains:

• Red flashing light
• Alarm horn

The Acknowledgment Switch unit contains:

• ACKNOWLEGED light
• RESET push button 
• TEST push button 

Compatible Consoles

• TLS-3XX/4XX Series
• TLS-IB
• TLS-50
• TLS-HLD
• TLS2

Related Manuals

Depending on your installed console, you should reference the appropriate manuals below, to connect/setup the 

Overfill Alarm:
576013-879 TLS-3XX Series Site Prep Manual

576013-623 TLS-3XX Series Setup manual

577013-608 TLS-50 Site Prep manual

577013-609 TLS-50 Setup manual

577013-756 TLS2 Site Prep manual

577013-757 TLS2 Setup manual

577013-719 TLS-IB Site Prep manual

577013-785 TLS-HLD Setup manual

577013-784 TLS-HLD Site Prep manual

577013-879 TLS-4XX Site Prep Manual

Contractor Certification Requirements

Veeder-Root requires the following minimum training certifications for contractors who will install and setup the 

equipment discussed in this manual:

Service Technician Certification (Previously known as Level 2/3):

 Contractors holding valid Technician 

Certifications are approved to perform installation checkout, startup, programming and operations training, system 

tests, troubleshooting and servicing for all Veeder-Root Series Tank Monitoring Systems, including Line Leak 

Detection.

TLS-3xx Technician Certification:

 Contractors holding valid TLS-350 Technician Certifications are approved to 

perform installation checkout, startup, programming and operations training, troubleshooting and servicing for all 

Veeder-Root TLS-300 or TLS-350 Series Tank Monitoring Systems, including Line Leak Detection and associated 

accessories.

Содержание Overfill Alarm

Страница 1: ...Installation Guide OverfillAlarm Manual No 576013 589 Revision F...

Страница 2: ...r Terms and Conditions VEEDER ROOT S PREFERRED CARRIER 1 Contact Veeder Root Customer Service at 800 873 3313 with the specific part numbers and quantities that were missing or received damaged 2 Fax...

Страница 3: ...Overfill Alarm Horn Delay Time 9 Testing the Overfill Alarm with the Acknowledgment Switch 9 Setting the Overfill Alarm Horn s Volume Level 9 Testing the Overfill Alarm with the Console 9 Testing Over...

Страница 4: ...HLD Setup manual 577013 784 TLS HLD Site Prep manual 577013 879 TLS 4XX Site Prep Manual Contractor Certification Requirements Veeder Root requires the following minimum training certifications for c...

Страница 5: ...ions may only be submitted by selected Distributors Safety Symbols The following safety symbols are used throughout this manual to alert you to important safety hazards and precautions EXPLOSIVE Fuels...

Страница 6: ...rm and Ack switch units are installed in a volatile combustible or explosive Class I Division I and Division II atmosphere Explosion could occur if alarm wires share tank monitor or console probe or s...

Страница 7: ...mensions and Figure 2 shows the Acknowledgment Switch mounting dimensions Figure 1 Overfill Alarm Mounting Dimensions VEEDER ROOT 0 313 8 mm dia 4 holes 2 50 8 mm 1 2 conduit connector 1 6 40 6 mm 4 1...

Страница 8: ...mounting tabs on the housing Acknowledgment Switch 1 Select a mounting location where the Acknowledgment Switch can be easily activated by the tank truck driver In addition consider the ease of routin...

Страница 9: ...power panel 3 Pull one wire from the switch to the TLS Console for connection to the alarm relay 4 Pull one wire for line from the alarm relay in the TLS Console to the power panel 5 Turn power Off an...

Страница 10: ...ground connection is made in accordance with all local codes If using a properly grounded rigid metal conduit or equivalent to enclose the external wiring for the Overfill Alarm the ground hub that te...

Страница 11: ...elay Connection TLS 350 4 Relay Output Module Connection TLS 4XX Overfill Alarm Relay Connector Overfill Alarm without Acknowledge Switch see Figure 4 Overfill Alarm terminal 2 J6 1 J5 1 NO NO NO NO L...

Страница 12: ...at the preset delay time you set above 0 60 seconds The red light will continue to flash until the TEST button is released Setting the Overfill Alarm Horn s Volume Level 1 Locate the adjustment set sc...

Страница 13: ...reapply power to the console and Overfill Alarm If the Overfill Alarm was wired properly the alarm horn will sound immediately followed by the red alarm light flashing 3 Press the RESET button on the...

Страница 14: ......

Отзывы: