BATH INITIAL FILL AND VOLUME ADJUSTMENTS
Note:
On a daily basis, check the liquid level in each of the baths and adjust for the proper
volume.
Overflow should not occur
. On a monthly basis, check the liquid in each bath for
proper composition and adjust as needed.
Procedure 5-23: Bath Initial Fill and Volume Adjustment
1. Fill the bath to the proper level (between the fill lines designated by the manufacturer) with a
water/glycol mixture (50/50) targeted at a freezing point of - 40 °F (+/- 10).
Warning!
Glycol is toxic. Ensure that no person, food surfaces or drink comes in
contact with Glycol.
2. Turn the bath On, and set to the target temperature.
3. Allow the bath to circulate and equilibrate prior to use. It typically takes about one hour for the bath to
equilibrate.