Installation
Shipping and Receiving
54
Dimension 3100 Manual
Rev. D
4.1
Shipping and Receiving
4.1.1 Equipment Requirements
The following equipment is necessary for successful installation of the Dimension 3100 SPM
system. Verify the following is on-hand before beginning installation:
Equipment Received
•
Dimension 3100 Manual
•
Dimension 3100 Controller
•
Dimension 3100 Microscope
•
Dimension Microscope Head
•
Computer
•
Hard Drive Back-up on CD
•
Mouse, Keyboard and Trackball
•
Dimension Accessories Kit
•
Cantilever Stand
•
Tip Holders (2)
•
Wafer Handling Tool Kit
•
Calibration Standard
•
Vibration Isolation Pad
•
Cable Clamp (needed only with VT-103 vibration isolation table)
•
Power Strip
•
8" Sample Chuck (option)
•
Extender Box (option)
Содержание Dimension 3100
Страница 12: ...xii Dimension 3100 Manual Rev D ...
Страница 20: ...List of Figures xx Dimension 3100 Manual Rev D ...
Страница 72: ......
Страница 106: ......
Страница 118: ......
Страница 214: ...Scanning Tunneling Microscopy STM Etching Tungsten Tips 194 Dimension 3100 Manual Rev D ...
Страница 222: ......
Страница 266: ......
Страница 274: ......