Safety
Power-up Sequence (Installation and Service Only)
30
Dimension 3100 Manual
Rev. D
______
25-pin D cable from computer to NanoScope controller
______
NanoScope controller AC power cable to power strip
______
DC power cable from Dimension 3100 controller to Dimension 3100 SPM back
panel
______
Fiber optic cable from Dimension 3100 controller to Dimension 3100 SPM objective
Final Installation
_______
1.
Install the objective.
_______
2.
Install the Dimension head.
_______
3.
Mount the vacuum sample chuck.
2.6.2 Turn on the Dimension 3100 SPM (Service and Installation Only)
1. Verify that all system components are plugged into AC power with the correct voltage.
2. Verify that all cables are connected properly.
3. Turn on the computer using the push-button switch located on the front of the computer.
4. Turn on the monitors (2) using the push-button switches located on the front of the monitors.
5. Turn on the NanoScope controller using the power switch located on the rear of the
NanoScope controller.
6. Turn on the Dimension 3100 controller using the power switch on the rear of the Dimension
3100 controller.
CAUTION:
The objective, Dimension head, and vacuum sample chuck should
be the final equipment installed due to the sensitive nature of these
components.
ATTENTION:
L’objectif, la tête du Dimension and la platine porte-échantillon
devraient être installés en dernier, à cause de leur fragilité.
VORSICHT:
Das Objektiv, der Mikroskopkopf und der Vakuumprobenhalter
sind empfindliche Komponenten des Dimension SPMs, und sollten
als letztes installiert werden.
Содержание Dimension 3100
Страница 12: ...xii Dimension 3100 Manual Rev D ...
Страница 20: ...List of Figures xx Dimension 3100 Manual Rev D ...
Страница 72: ......
Страница 106: ......
Страница 118: ......
Страница 214: ...Scanning Tunneling Microscopy STM Etching Tungsten Tips 194 Dimension 3100 Manual Rev D ...
Страница 222: ......
Страница 266: ......
Страница 274: ......