2-4
Installing the Dektak 150 System
Figure 2-2: Back of the Dektak 150 Surface Profiler
PREPARING FOR INSTALLATION
This section tells you how to prepare an operating environment, unpack the Dektak 150 shipping
boxes, and remove the shipping brackets on the surface profiler. For instructions on installing the
system, see
Installing the System on page 2-9
.
Preparing Your Location
Prior to unpacking the system, you must make sure that your operating environment meets the
requirements outlined in
Appendix A, Facilities Specifications
. At the minimum, you must:
•
Ensure that the location is free from excessive air turbulence, vibration from machinery, dust
and dirt, or other environmental contaminants.
IMPORTANT!
The above factors will affect the profiler’s performance.
Electronics box
(E-Box)
Base
Cable manifold
on E-box
Vacuum connect
Z-axis lockdown
screw
Содержание Dektak 150
Страница 1: ......
Страница 2: ...P N 980 294 Standard P N 980 298 Cleanroom Revision A DEKTAK 150 SURFACE PROFILER USER S MANUAL ...
Страница 7: ......
Страница 17: ......
Страница 81: ......
Страница 105: ......
Страница 149: ......
Страница 191: ......
Страница 251: ......
Страница 257: ...A 6 Facilities Specifications Figure A 6 Dektak 150 without Enclosure Side View ...
Страница 258: ...Facilities Specifications A 7 Figure A 7 Dektak 150 Dimensions without Enclosure Top View ...
Страница 259: ...A 8 Facilities Specifications Figure A 8 Dektak 150 without Enclosure Center of Mass ...
Страница 273: ......
Страница 283: ......
Страница 320: ...3D Mapping Function E 37 Figure E 26 Database Options Button Figure E 27 Database Options Dialog Box ...
Страница 321: ......
Страница 331: ......
Страница 333: ......
Страница 336: ......
Страница 337: ......
Страница 349: ......