![Vatech Green X Скачать руководство пользователя страница 66](http://html1.mh-extra.com/html/vatech/green-x/green-x_installation-manual_3611326066.webp)
4. Installing the X-ray Unit: Base Stand Type
58 Green X / X18 (Model: PHT-75CHS) Installation Manual
4.5
Connecting the Cables to the Equipment
To connect the cables to the equipment:
1. Connect the cables in the back of the column as shown in the figure.
Parts and
Accessory
Optic Cable
Cable No.
H000014A
(Part No. 21)
Cable Tie
(Part No. 20)
Exposure Switch
(Part No. 2)
Содержание Green X
Страница 1: ...Installation manual Model PHT 75CHS Version 1 10 English...
Страница 2: ......
Страница 8: ......
Страница 40: ...3 Before the Installation 32 Green X X18 Model PHT 75CHS Installation Manual Transportation Example...
Страница 116: ...9 Installing Software 108 Green X X18 Model PHT 75CHS Installation Manual 3 Click Finish to complete the installation...
Страница 144: ......
Страница 146: ...Appendix A 2 Green X X18 Model PHT 75CHS Installation Manual Schematic Diagram Components Supplied...
Страница 162: ...Appendix A 18 Green X X18 Model PHT 75CHS Installation Manual This Page Left Blank Intentionally...
Страница 164: ...com...