
3. Before the Installation
Green X / X18
(Model: PHT-75CHS) Installation Manual 31
En
glis
h
3.4
Transporting the X-ray Unit
To transport the X-ray Unit:
At a minimum, three persons are required to lift and
carry the X-ray unit.
1. Tape the column to attach it to the foam.
2. Grab the handles and lift the X-ray unit (main unit) from the pallet.
3.
Place the X-ray unit with EPS
(Main Base)
on a transport dolly and carry
the unit to the installation site.
When putting the Main Unit on the dolly, ensure that
the center of the mass indicator is aligned with the
center of the dolly.
If you move the unit manually, ensure that the
person holding the upper handle takes the lead.
Содержание Green X
Страница 1: ...Installation manual Model PHT 75CHS Version 1 10 English...
Страница 2: ......
Страница 8: ......
Страница 40: ...3 Before the Installation 32 Green X X18 Model PHT 75CHS Installation Manual Transportation Example...
Страница 116: ...9 Installing Software 108 Green X X18 Model PHT 75CHS Installation Manual 3 Click Finish to complete the installation...
Страница 144: ......
Страница 146: ...Appendix A 2 Green X X18 Model PHT 75CHS Installation Manual Schematic Diagram Components Supplied...
Страница 162: ...Appendix A 18 Green X X18 Model PHT 75CHS Installation Manual This Page Left Blank Intentionally...
Страница 164: ...com...