16
Värmebaronen Vedolux 55
120ºC
Vedolux 55
Firing - starting with an LPG burner
• Insert finely chopped wood. On top of this place a layer
of medium-sized pieces of wood. Fill the rest of the
combustion chamber with large pieces.
• Close the wood filling hatch.
• Light the LPG burner and insert the nozzle in the upper
hole in the inner ash hatch. Move the flame from side
to side. After approximately one minute, the wood
should have been ignited.
Adding wood
To avoid smoke entering the
boiler room and the risk of
flames emerging, the bypass
damper must be opened before
the wood filling hatch.
Level out the bed of embers.
Add wood, stacking well. The
quantity must be adapted to the
temperature in the accumulator
so that the temperature does
not become too high. Filling the
chamber with wood increases
the temperature in the boiler
and a 660 gal. accumulator by
approximately 104°F.
Close the wood filling hatch and then the bypass
damper.
When the wood has burned up and the flue gas
temperature has fallen to approximately 212°F, the fan
and the charging pump for the accumulator stop.
RISK OF BURN INJURIES!
Do not open the boiler's hatches if the fan is idle and
you suspect there may be fire in the boiler.
20. Main power switch.
21. Thermostat for fan and charging pump.
22. Starting the fan when the boiler is cold.
25. Overheating protection.
Start
1. The bypass damper must be closed.
2. Insert finely chopped wood and possibly paper in the
boiler.
3. Switch the main switch on (green field must be
visible).
4. Set the 'FAN STOP' thermostat to 248°F (120°C).
5. Press in 'FAN START'; the fan starts.
6. Light the boiler, preferably with an LPG burner.
First firing
When the boiler is fired for the first time, the firing
should be started carefully so that the remaining
moisture in the ceramics can evaporate slowly.
Excessive firing may cause cracks in the ceramics. Fire
with just a small fire the first time. When the ceramics
have dried, the boiler can be fired with proper fires. The
ceramics do not absorb moisture while the boiler is in
use.
Firing - starting
• Insert finely chopped wood and then crumpled
newspaper.
• Press 'FAN START'. The fan will start. Light the paper.
Leave the wood filling hatch ajar.
• Wait a while before you shut the wood filling hatch.
The wood must have been properly ignited (flue gas
temperature approximately 248°F (120°C)). Let it burn
until a strong bed of embers has been formed.
20
22
21
25
26
27
26. Indication, overheating protection triggered.
27. Thermometer, shows boiler temperature.
28. Pressure gauge, displays the pressure in the heating
system.
Содержание Vedolux 55
Страница 1: ...13 0 9 11 T H L n o x x x x r e v 0 Installation and maintenance Vedolux 55...
Страница 2: ...2 V rmebaronen Vedolux 55...
Страница 10: ...10 V rmebaronen Vedolux 55...
Страница 23: ......