background image

14

Värmebaronen Vedolux 55

Operation

Starting the boiler from cold:
•  Switch the main switch on. The green field must be 

visible.

•  'FAN STOP' thermostat set to 248°F. The thermostat 

detects the flue gas temperature.

•  Press in 'FAN START'. The time relay operates and the 

fan starts.

When the set time of the time relay, 30 minutes, has 
elapsed, its contact switches and the charging pump 
for the accumulator system will be controlled by the 
thermostat.

When the wood has been burned up and the flue gas 
temperature has fallen below the set temperature, 
the fan and the charging pump will stop.
If the boiler temperature exceeds 212-220°F, the 
overheating protection will be triggered. The fan stops 
and the charging pump remains in operation.
'ALARM' lights up to indicate that the overheating 
protection has been triggered. The overheating 
protection is reset by pressing 'RESET' on the control 
panel. It is not possible to reset the system until the 
boiler temperature has fallen below 200°F. An operating 
thermostat limits the boiler's maximum working 
temperature.

Electrical connection

  

The installation must be carried out according to 
existing rules and standards under the supervision of 
a qualified electrician.

The boiler is connected to the fixed installation with 
rubber cable via an all-pole main breaker with at least 
0.12 in breaking distance.
The electrical connections are on the rear of the boiler in 
the form of three quick connectors:

15.  Mains connection, 115 V~, cable is supplied.
16. Fan.
17. Charging pump for the accumulator system. 

15.  Power supply connection. 

a. cable part, sleeve. 
b. chassis part, pin.

16.  Fan connection. 

a. cable part, pin. 
b. chassis, sleeve.

17.  Connection for charging pump for accumulator system. 

a. cable part, pin. 
b. chassis, sleeve.

18.  Terminal block, internal earth connections.
20. Main power switch.

93°C

25

15a

16a

17a

18

20

21

22

24

26

15b

17b

16b

45

BROWN
BLUE
YELLOW/

FAN

POWER 

SUPPLY 

115 V~

ALARMS

GREEN

CIRCULATION PUMP

  

Any intervention in the boiler's electrical 
equipment that requires tools must be 
carried out under the supervision of a 
qualified electrician.

21.  Thermostat for fan and charging pump.
22.  Fan start when the boiler is cold.
24. Time relay, power off delay.
25. Overheating protection.
26.  Indication, overheating  

protection triggered.

45.  Operating thermostat 200°F.

  

If the boiler is connected to an emergency power 
unit, this must produce a pure sine wave. Otherwise, 
the boiler's electrical components may be damaged.

15

16

17

Incoming

Fan

Circulation pump

BLUE
YELLOW/

GREEN
BLACK

BLACK
YELLOW/

GREEN
BLUE

200°F 230°F

Содержание Vedolux 55

Страница 1: ...13 0 9 11 T H L n o x x x x r e v 0 Installation and maintenance Vedolux 55...

Страница 2: ...2 V rmebaronen Vedolux 55...

Страница 3: ...oiler from cold Installation 15 System check Instructions to customer About wood firing About wood handling wood and storage FOR THE USER Starting the boiler 16 Starting First firing Firing starting F...

Страница 4: ...4 V rmebaronen Vedolux 55 Serial number Installation date Plumber Phone Electrician Phone Other To be completed when the Vedolux 55 is installed...

Страница 5: ...the chimney so that there are no gas and dust leaks Thermal valve STW has been fitted Expansion tank volume correctly dimensioned Pay attention to prepressurisation in a closed tank System has been f...

Страница 6: ...fan causes the flames to move downwards through the grate The gases remaining are combusted in the ceramics The hot flue gases then continue through the boiler s flues where the heat is absorbed and...

Страница 7: ...le material on the boiler or flue pipe Be careful if you need to open the boiler s hatches during operation If the hatch is opened too fast flames may shoot out Read these instructions carefully befor...

Страница 8: ...h hatch with draught hatch 14 Ash drawer 15 Leg frame 16 Adjustable foot bolts The hatches are supplied right hung but can be reversed so they are left hung A plate needs to be changed on the hatch to...

Страница 9: ...output 310 F Flue gas flow rate 0 11 lb s Operation natural ventilation fan with flue gas fan Condensing non condensing non condensing Positive negative pressure at flue gas outlet negative pressure P...

Страница 10: ...10 V rmebaronen Vedolux 55...

Страница 11: ...tandards It is important for all connection points and flues not to leak dust and gas If the boiler is connected higher up the chimney than a previous boiler was connected the lower inactive part must...

Страница 12: ...narrow pipe and the natural draught will not be enough to compensate for the long distance For the boiler to deliver the promised output the chim ney should not have an area that is too small or be t...

Страница 13: ...perature in the event of boiling Follow the valve manufacturer s installation instructions Filling heating system The boiler is fitted with valves for filling and draining Turbulators If the turbulato...

Страница 14: ...ion of a qualified electrician The boiler is connected to the fixed installation with rubber cable via an all pole main breaker with at least 0 12 in breaking distance The electrical connections are o...

Страница 15: ...wood is damp a large part of its energy is used to dry it combustion is impaired and the risk of tar coating increases On account of its high acid content firing with oak for extended periods of time...

Страница 16: ...here may be fire in the boiler 20 Main power switch 21 Thermostat for fan and charging pump 22 Starting the fan when the boiler is cold 25 Overheating protection Start 1 The bypass damper must be clos...

Страница 17: ...ontrolled by the draught that the fan creates and by the oxygen supply via the primary and secondary air that is supplied via the inner ash hatch To optimise combustion and efficiency the flue gas tem...

Страница 18: ...the end of the flue You can tell when it has reached the end because less force is required to move it Refit the turbulators Open the wood filling hatch and bypass damper Rake out the ash on the plate...

Страница 19: ...mber Scrape the ceramics softly and carefully when removing ash from the boiler Let a layer of ash of a few centimetres form a protective layer on the grate Fire only with real wood not plastic proces...

Страница 20: ...air valve is open Secondary air damper open too far If the damper is open too far the distribution between primary and secondary air is incorrect Start by having the secondary air damper completely cl...

Страница 21: ...nnection See points above Boiling sound in the boiler Low pressure head Check the pressure should be 14 5 psi The expansion tank must be adapted to the volume and the temperature variations that occur...

Страница 22: ...x 12 mm 8 x 6 9 x 0 5 in 3 310210 Front ceramic grate 1 310211 Rear ceramic grate 1 310212 Left ceramic duct 1 310213 Right ceramic duct 1 320007 Wood filling hatch 1 320017 Soot hatch 1 320020 Draug...

Страница 23: ......

Страница 24: ...V rmebaronen AB Arkelstorpsv gen 88 SE 291 94 Kristianstad Tel 46 44 22 63 20 Fax 46 44 22 63 58 www varmebaronen se www varmebaronen com info varmebaronen se...

Отзывы: