![Vari Lite VL2000 Скачать руководство пользователя страница 74](http://html1.mh-extra.com/html/vari-lite/vl2000/vl2000_user-manual_3512493074.webp)
M
ENU
S
YSTEM
: S
ELF
T
ESTS
4
0 2 . 9 6 7 3 . 0 0 0 1 D
02-M ay- 03
65
Self Tests
Running Parameter Tests
The luminaire is capable of running self tests by using the
TEST
menu functions. For complete
details and values for each test refer to
Note:
After 10 seconds of inactivity, the menu display will change to the default state showing the
address.
When running tests on multiple luminaires, a loopback connector is required at the master luminaire
(first in link) and a male termination connector is required at the last luminaire in the link. (Refer to
for more information regarding the construction of these connectors.)
Figure 4-5: Test Setup
To run tests:
Step
1. Press [Menu].
Step
2. Press [Up] / [Down] arrows until
Test
appears. Press [Enter].
Step
3. Use [Up] / [Down] arrows to select a parameter to test. Refer to
for a complete list of test parameters which can be chosen.
Step
4. Press [Enter] to run test.
Step
5. Press [Menu] to stop test at any time.
Termination Connector
Data Thru
Data Thru
Master luminaire containing
software version to download
Luminaire 1
requiring update
Luminaire 2
requiring update
Loopback Connector
www.carlosmendoza.com.mx