![Varec 2500 Скачать руководство пользователя страница 59](http://html1.mh-extra.com/html/varec/2500/2500_installation-and-operation-manual_3495994059.webp)
Varec, Inc.
49
•
That section gives instructions to reset and calibrate the counter, install transmitters
and other auxiliary equipment, and replace the back cover.
Note
Torque back cover bolts to 6 ft-lb. Do not over torque!
19. Refill gauge head with oil if required.
20. Close the tank inspection hatches and manholes.
Oil Seal Installation
For tank configurations that include optional oil seal accessories, refer to these illustrations
and perform the installation procedures included in this section.
For most installation, use a low-pour-point, food grade, water-white, mineral oil. Examples are
provided in section , Lubrication, on page 71.
Содержание 2500
Страница 2: ......
Страница 6: ...vi Installation and Operations Manual...
Страница 10: ...2500 Automatic Tank Gauge 10 Installation and Operation Manual...
Страница 16: ...2500 Automatic Tank Gauge 6 Installation and Operations Manual...
Страница 66: ...2500 Automatic Tank Gauge 56 Installation and Operations Manual...
Страница 68: ...2500 Automatic Tank Gauge 58 Installation and Operations Manual...
Страница 108: ...2500 Automatic Tank Gauge 98 Installation and Operations Manual...
Страница 112: ...2500 Automatic Tank Gauge 102 Installation and Operations Manual...
Страница 118: ...2500 Automatic Tank Gauge 108 Installation and Operations Manual...
Страница 123: ......