![Varec 2500 Скачать руководство пользователя страница 39](http://html1.mh-extra.com/html/varec/2500/2500_installation-and-operation-manual_3495994039.webp)
Varec, Inc.
29
Figure 8:
Conduit Connection and Tank Side Support Bracket Details
Installing a Roof Reading Gauge Head
Note
Ensure you have completed all previous steps from your installation checklist
before proceeding.
Warning
When removing the gauge head back cover, stand to one side as the last bolt is
removed. If the negator motor spring is broken, the broken pieces may cause injury when
the cover is removed.
1. Remove the back cover and gasket from the gauge head.
2. Apply pipe thread compound and attach the gauge head to the exterior vertical pipe.
Position it for convenient reading.
1
1-1/2 Inch NPT union and
close nipple, furnished by customer
5
Bolted
Tank Wall
Welded
Tank Wall
Содержание 2500
Страница 2: ......
Страница 6: ...vi Installation and Operations Manual...
Страница 10: ...2500 Automatic Tank Gauge 10 Installation and Operation Manual...
Страница 16: ...2500 Automatic Tank Gauge 6 Installation and Operations Manual...
Страница 66: ...2500 Automatic Tank Gauge 56 Installation and Operations Manual...
Страница 68: ...2500 Automatic Tank Gauge 58 Installation and Operations Manual...
Страница 108: ...2500 Automatic Tank Gauge 98 Installation and Operations Manual...
Страница 112: ...2500 Automatic Tank Gauge 102 Installation and Operations Manual...
Страница 118: ...2500 Automatic Tank Gauge 108 Installation and Operations Manual...
Страница 123: ......