Varan motors
BCIE SARL, gruuss-strooss 28, 9991 Weiswampach, Luxembourg
T: 00352/26908036 – F: 00352/26908040
NEPPJ-04
• To prepare the pump and the ram for operation, remove the dust cover from both the hose coupler (3) and the ram
coupler (4). Connect the hose (2) to the ram (8). Select the appropriate attachment (5) and assemble onto the plunger (6).
• When using the extension tubes, never mount the shortest tube in the middle but mount them at the end.
• Close the release valve (1) by turning it clockwise until snug. Never over-tighten. Operate the handle so as to extend the
plunger and continue pumping until the desired operation is complete.
NOTE: Before operating the unit, loosen the air vent valve (9) by turning it in an anticlockwise direction. This may improve
pumping efficiency. When the unit is not in use, close the air vent valve to avoid oil leakage. Do not close the air vent valve
unless the ram is fully retracted.
Cleaning and Maintenance
Store your
machine
in a dry place with the release valve opened.
After prolonged use, change the oil inside the pump. Open the pump system and the release valve, and empty all oil. Close the release valve, refill
with oil (± 500g) and close the pump system. Please use appropriate oil.