background image

Hazardous conditions to avoid:

DURING BACKWASHING CYCLE

Prior to beginning the backwash cycle, turn booster pump off and close the inlet and outlet ball
valves to prevent water flow into the feeder during the backwash cycle.  Once backwashing cycle is
completed, return valves to previous setting and resume booster pump operation.  

SHOCKING OR SUPERCHLORINATING

Prior to the application of shock or superchlorinating product to the pool, turn booster pump off and
close the inlet and outlet ball valves to prevent water flow into the feeder.  Do not reopen valves for
at least 2 hours following application of shock or superchlorinating product to prevent contamination
of tablets.

WINTERIZATION OF FEEDER

If the pool circulation system is shut down during the winter the following procedures are recom-
mended:

1.  Operate the feeder until all the Vantage Calcium Hypochlorite Tablets are dissolved. 
2.  Flush the feeder with fresh water.  Follow cleaning procedures to remove any residue in the

feeder.  Be careful when handling the float assembly and level switch.

3.  Drain feeder completely of water.  
4.  Disconnect feeder from power and water supply.  
5.  Store feeder out of sun in a clean, dry location.  

8

Содержание ACF-18

Страница 1: ...Installation and Operation Manual ACF 18 Automatic Chlorinating Feeder...

Страница 2: ......

Страница 3: ...ter P2002202 In Line Strainer P2002203 25 of 5 8 OD Tubing P2002225 Feeder Discharge Assembly discharge valve body discharge fitting and locking bolt P601204 Chlorine Feed Assembly sieve plate legs an...

Страница 4: ...er Discharge Assembly 3 Discharge Fitting 4 Float Valve Body 5 Float Assembly 6 Chemical Feed Solenoid Valve 7 Supply Manifold 8 Inlet Water Solenoid Valve 9 Rinse Nozzle 10 Level Switch Assembly 11 C...

Страница 5: ...n inlet pressure of 10 45 psi The flow rate will be con trolled in the range of 1 0 to 1 5 gpm CONNECTING THE ACF 18 RECOMMENDED INSTALLATION METHODS SIDESTREAM WITH BOOSTER PUMP AND VENTURI see Figur...

Страница 6: ...p but before the filter while the sidestream effluent is returned after the heater The sidestream flow and venturi must be selected to remove a minimum of 1 5 gpm from the feeder at all times When usi...

Страница 7: ...ned directly into the surge pit or vacuum filter pit Erratic controller readings can occur if chlorine is injected into the system prior to the sample line Heater corrosion or scaling can occur if the...

Страница 8: ...lves Pool Return Venturi w check valve Inlet Ball Valve Flow Meter Strainer 1 2 Feeder Inlet Flow Control Valve optional H EATER if present P OOL P UMP B OOSTER P UMP F ILTER denotes PVC piping denote...

Страница 9: ...er Flow From Pool Isolation Valves Pool Return Venturi w check valve Inlet Ball Valve Flow Meter Strainer Flow Control Valve optional H EATER if present P OOL P UMP F ILTER denotes PVC piping denotes...

Страница 10: ...ion tank using the bolt located on the float valve arm For detailed instructions on adjusting the float contact your Vantage Representative 6 Prior to filling feeder read First Aid Precautionary State...

Страница 11: ...der parts with fresh water The float assembly and other parts can be damaged with rough handling Use caution when cleaning these parts 4 When all parts have been cleaned the interior of the tubing ven...

Страница 12: ...alves to prevent water flow into the feeder Do not reopen valves for at least 2 hours following application of shock or superchlorinating product to prevent contamination of tablets WINTERIZATION OF F...

Страница 13: ...eration Manual Should the warranted equipment prove defec tive in workmanship or material the consumer s sole remedy shall be replacement of defective parts as is herein above expressly provided and u...

Страница 14: ...VTGACF60IOM 060507 Copyright 2007 Document Version 01 AllChem Performance Products LP...

Отзывы: