background image

TENT PITCHING INSTRUCTIONS – ISIS 500/600 (UK) 

 
FLYSHEET FIRST PITCHING: 

• Assemble poles and lay them on the ground 
• Open out flysheet and position in required direction 
• Insert all poles through the pole sleeves on outside of fly sheet 
• Poles are colour coded to match corresponding pole sleeve entry points 
• Locate one end of each pole at one side of the tent into the metal pin system 
attached to the groundsheet 
• Make sure poles locate into correct pin system, all poles follow corresponding 
flysheet seams to pin system 
• Push poles into an arch from opposite ends and locate pole ends into 
corresponding metal pin 
• Tighten all the tensions straps at the base of the poles. 
• Securely peg out the rear corners of the tent 
• Pull the tent forward until taut and peg out the main corners at the other end of 
the tent using the V pegs 
• “Walk”  flysheet forward, away from pegged points, until tent takes shape 
• Pull the tent until the groundsheet is taut and peg out the main corners at the other end of the tent 
• Ensure the tent is in a straight line 
• Peg out the remaining poles and pegging points using pin pegs at the base of poles 
• Attach all flysheet pole clips onto poles 
• The groundsheet should be flat and wrinkle free 
• Peg out ALL guy lines using pin-pegs ensuring that guy line fabric attachment points are evenly tensioned. 
 

INNER ATTACHMENT: 

• Open out inner tent inside flysheet and position doorways to correspond with the living area 
• Suspend the inner by attaching toggles of inner tent through rings on inside of flysheet 
• The inner attachments are colour coded to match the clips on the roof of the flysheet 
• Do the rear first and work forward 
• It is advisable to remove the inner when taking down the tent when wet. 
 

TENSION BAND SYSTEM: 

• Remove Tension Band System from pockets and attach into the corresponding clips at the apex of the 
pole 
• Adjust the straps until they are taut 
• DO NOT OVERTENSION. Excess tension will alter the shape of the tent 
• Tension bands are designed to stabilise the tunnel structure of the tent 
• The bands are not required to be used in calm weather 
 

RING & PIN SYSTEM: 

• Locate one end of pole onto the corresponding metal pin (figure 1) 
• Peg the corners of the tent through the metal rings using pin-pegs (figure 2) 
• The ends of the short, straight pole locate into the brass eyelets behind the dome pole sleeve 
 
 
 
 
 
 
 
………………………………………………………………………………………………………………………………………………………………………………………………………… 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Отзывы: