3.18
Implement signal connection
The implement signal connection complies with the ISO 11786 standard.
The implement signal connection is extra equipment. The implement signal
connection is situated in the lower part of the right-hand side pillar in the cab.
1
GUID-3B93B1D4-E8C3-4598-B171-BE6DB92730AA
1. Implement signal connection
An implement connected to the connector can use the following tractor information:
1
2
4
3
5
6
7
GUID-42EFCF41-AD3F-4A1F-ABBD-E09459F4B722
1. Speed information of the radar, 130 pulses/m
2. Power supply max. 5 A
3. Rear linkage position (0–10 V)
4. In work (≤1.5 V)/out of work (≥6,3 V)
5. Rear power take-off (PTO) speed, 6 pulses/round
6. Transmission speed (wheel speed), 130 pulses/m
7. Ground
3. Operation
- 207 -