Valor 479MP Скачать руководство пользователя страница 1

Содержание 479MP

Страница 1: ...TED BY N tNDUSTRtES LTD 829 Third Street West North Vancouver B C V7P 3K7 Ij 49843496t FOR YOUR SAFETY Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any...

Страница 2: ......

Страница 3: ...s 7 in diameter 1 2 1 INSIDE THE ROOM Choose a room location against an outside wall which will allow thefurnace to be sited as shown in figure 1 Use the wall plate unit supplied by attaching ittothew...

Страница 4: ...D Vertical clearance to ventilated soffit located above the terminal within a 1 8 46 horizontal distance of 2 feet 60cm from the center line of the terminal 4 E Clearance to unventilated soffit 1 2 30...

Страница 5: ...nector 1 Ceramic Fibre Sealing Ring Check that all the contents are in the pack and are undamaged IMPORTANT Before cutting the vent opening in the wall make sure that the finished floor level is known...

Страница 6: ...nd wail plugs d Replace the wail plate unit Fit a washer under the head of each of the four wood screws and fasten the wall plate unit securelyto the wall using the woodscrews 0 0 7 Furnace Upper Moun...

Страница 7: ...nsert the styrofoam support and cut off the vent tubes squarely at the marked position MAKE SURE ALL STYROFOAM IS REMOVED FROM THE VENT UNIT AFTER CUTTING b Fit the vent inlet outlet unit on to the fu...

Страница 8: ...he edges of the wall plate and tighten the screws Apply a bead of silicone sealant around the vent tube where it exits the wall plate See Fig 10 1 9 CONNECT THE GAS SUPPLY Gasconnection is NPTandisatt...

Страница 9: ...No 1 at the left side of the log support bed Locate the hole at the front edge of the log onto tab A on the front log support rail and locate the projection underneath the log into recess B in the ce...

Страница 10: ...he cover The cover will then return to its original position Test the action of the unit by pulhng the access panel forward against the springs and allowing it to snap back into position Make surethat...

Страница 11: ...ssively counter clockwise and check for the correct flame pattern at each position See Figs 1 9 20 The control settings are Control Main Burner Decorative Position Flame Burner 1 IGN OFF OFF Pilot Ign...

Страница 12: ...should be no appreciable deposits of carbon on the logs d Replace the burner access panel washers and bushings Make sure that the access panel operates satisfactorily as described in section 1 11 a Lo...

Страница 13: ...r g Point out the location of the supply piping shut off valve and its operation h Point out the location of the vent terminal Advise that for safe and efficient operation no objects should be placed...

Страница 14: ......

Отзывы: