43
Installation
1. Carefully unpack the kit, as the logs are fragile.
2. Install the steel platform around the burner as
indicated. The openings in the platform should be
underneath.
3. Place log 1 as shown with the pin in the hole.
4. Place log 2 from on top of log 1, across the burner to
the front platform.
Installed platform
1
2
1
Split Wood Kit 1500SWK
Material required
• Black steel platform (supplied with appliance)
• Split Wood Kit, which contains:
• 9 logs (numbered)
• 1 bag of small embers
• 1 bag of splinters
Overview
1
2
3
4
7
8
9
10
11
1
2
3
4
7
8
9
10
11
Installation
Fuel Beds