![VALCO MELTON D4-L Скачать руководство пользователя страница 53](http://html1.mh-extra.com/html/valco-melton/d4-l/d4-l_user-manual_3183422053.webp)
MUS01210202
07/01/2020
MELTON, S.L.U. - POLIGONO INDUSTRIAL AGUSTINOS CALLE G-34,31160 ORCOYEN, NAVARRA
TEL: 00 34 948 321580 Fax: 00 34 948 326584 e-mail: [email protected]
48
Filling the Tank:
Before filling the tank, put on goggles, gloves and a long-sleeve
shirt to prevent possible burns caused by hot adhesive
splashing.
Make sure that the tank is clean and free of foreign particles.
Fill the heated tank with the hot
–melt material up to a maximum of 10 mm below
the edge of the tank.
Close the cover of the tank immediately after filling it.
Note: Never operate the applicator if the tank is empty. If the
quantity of hot
–melt material is very small, the tank may overheat
leading to the carbonisation of the hot-melt material and the
formation of deposits inside the unit. This may lead to
unnecessary downtimes later on.
5.3. STOPS:
There are two cases:
Pump shut-down:
If you wish to stop pumping, you must turn the pump OFF on the pump screen.
The temperature control will maintain the machine temperature.
If the stop is to last for an extended period, activating the Low Maintenance
function is recommended
.
Total stop:
To completely disconnect the machine, press the general switch.
Tank fill
Содержание D4-L
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 95: ...0 1 2 1 1 3 4 53 6 0 53...
Страница 97: ...0 1 2 3 4 5 4 0 2 4 6 7 1 1 8 3 7 7 2 02 2 90 1 8 7 2 7...
Страница 98: ...0 1 2 103 1 4 5 6 7 3 5 0 8 4 4 9 6 10 7 8 8 8 0 8 8 8 8 8...
Страница 99: ...0 1 2 3 4 5 6 5 1 3 5 7 7 2 2 8 4 9 9 9 7 9 7 5 3...
Страница 100: ...0 1 0 2 0 3 4 5 6 7 6 2 4 6 8 3 3 9 5 0 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 4 0 8 8...
Страница 101: ...0 1 2 3 4 5 6 7 87 9 6 7 878 3 9 94...
Страница 102: ...0 0 1 2 3 4 5 6 2 3 3 7 4 45...