42
Installation and maintenance instructions 0020213394_05
F
Dual-circuit power supply heat pump tariff
–
3~/N/PE 400 V (wiring diagram 4 =
)
X102
X110A
X110B
X101
X103
X110
7
6
5
N L3 L2 L1
L1 L2 L3 N
N
L1
L3
L2
L1
1
2
3
1
Blocked power supply for internal auxiliary electric
heating
2
Power supply for control system
3
Continuous power supply
X110A
Optional power output for controller PCB (X110)
X110B
Optional power output for controller PCB (X110)
X101
Mains connection for compressor
X103
Optional power output for auxiliary heating (X102)
X102
Mains connection for internal auxiliary electric heat-
ing
X110
Mains connection for heat pump controller PCB
In this case, the heat pump is operated using two electricity tariffs (two consumption meters).
A continuous power supply ensures the operation of the compressor and the control PCB of the heat pump via its own elec-
tricity meter.
The power from the additional, blockable power supply for the internal electric back-up heater is supplied via a second elec-
tricity meter and can be suspended by the power supply network operator at peak times. The duration and frequency of the
outage is determined by the power supply network operator or must be clarified with them.
G
Installer level overview
Setting level
Values
Unit
Increment, select, ex-
planation
Factory setting
Setting
Min.
Max.
Installer level
→
Enter code
00
99
1 (competent person
code 17)
00
Installer level
→
Fault list
→
F.086
–
F.1120
1)
Deleting
Installer level
→
Test menu
→
Statistics
→
Compressor hours
Current value
h
Compressor starts
Current value
Build. pump hours
Current value
h
1)
See overview of fault codes