34
Air/flue pipe installation manual 0020308120_02
5.11.2 Installing the ridge tiles for the 60/100 mm
diameter roof duct
5.11.2.1 Scope of delivery, article number 303982
(black)
48
760
2
1
1
Ridge tile terminal,
black
2
48 mm air pipe clamp
5.11.2.2 Ridge roof duct
According to the specifications from the tile manufacturer, a
suitable ridge tile must be installed.
130
133
130
103
103
≥25
≥20
≤125°
Suitable ridge tiles are manufactured by:
Repco Roof Tiles Limited
49 Maurice Gaymer Road
Attleborough
Norfolk, NR17 2QZ
Tel: +44 (0) 808 1333001
5.11.2.3 Installing the ridge tile terminal
1
1.
Install the ridge tile in accordance with the specifica-
tions from the tile manufacturer.
2.
Insert the ridge tile terminal into the ridge tile.
3.
Align the ridge tile terminal in such a way that the two
fixing tabs
(1)
are at a right angle to the course of the
ridging. This ensures that the combustion air can be
extracted from between the ridge tile and the air hood
above the ridge tile.
1
2
4.
Bend the two fixing tabs
(2)
on one bar
(1)
.
5.
Use nails or screws to secure the fixing tabs.
6.
Install the boiler (
→
Installation instructions for the boil-
er).
7.
Install the extensions. (
8.
Install the elbows (
9.
Connect all of the pipe joints with air pipe clamps.
(
10.
Connect the ridge tile terminal and the boiler to exten-
sions and elbows.
Содержание ecoTEC plus VU Series
Страница 1: ...en Air flue pipe installation manual ecoTEC plus VU VUW VUI 0020308120_02 29 09 2022...
Страница 57: ......
Страница 58: ......
Страница 59: ......