0020230531_06 ecoFIT pure Installation and maintenance instructions
31
Condition
: Water hardness: > 3.57 mol/m
³
–
Domestic hot water temperature:
≤
50
℃
3.
Descale the water as required.
11 Handing over to the end user
▶
At the time of commissioning complete all relevant sec-
tions of the Benchmark commissioning checklist, located
at the rear of this document.
▶
For IE: Complete a “Declaration of Conformity” to indicate
compliance to I.S. 813. An example of this is given in the
current edition of I.S. 813.
▶
When you have finished the installation, affix the en-
closed sticker (which requests that the user reads the
instructions) to the front of the product in the end user's
language.
▶
Draw attention, to the current issue of the Gas Safety
(Installation and Use) Regulations, Section 35, which
imposes a duty of care on all persons who let out any
property containing a gas appliance in the UK.
▶
Explain to the end user how the safety devices work and
where they are located.
▶
Inform the end user how to handle the product.
▶
In particular, draw attention to the safety warnings that
the end user must follow.
▶
Inform the end user that they must have the product
maintained in accordance with the specified intervals.
▶
Pass all of the instructions and documentation for the
product to the end user for safe-keeping.
▶
Inform the end user about measures taken to ensure
the supply of combustion air and flue gas guiding, and
instruct the operator that he must not make any changes.
▶
Inform the end user that they must not store or use explo-
sive or highly flammable substances (such as petrol, pa-
per or paint) in the installation room of the product.
▶
Complete and sign off the Benchmark commissioning
check list.
▶
Complete and sign off the guarantee documentation.
Содержание ecoFIT pure Series
Страница 1: ...en Installation and maintenance instructions ecoFIT pure 825 835 0020230531_06 27 07 2020...
Страница 55: ......